20107: Alterations to previously approved development Reg. Ref. 17/228 comprising of the inclusion of a roof canopy to the new accessible passenger footbridge and 2 no. stairs, between the existing platforms. Carlow Railway Station is a protected structure.
Carlow Railway Station, Railway Road, Rathnapish
DecisionConditional grant
Decided25 June 2020
Application typePERMISSION
Source documents3
Site
What is on file
0refusal reasons11conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- , Development to be carried out in accordance with applicant's submitted reports, plans and particulars received on 25 March 2020, save as amended by conditions.Compliance
- ,Lift shafts: rendered, white painted. Copings: pressed aluminium. Cladding: vulcalucent glass. Balustrades: galvanised metal with stainless-steel woven mesh. Roofing: Schucco aluminium frame with polycarbonate roof sheeting Grey.Design Materials
- ,Consult Chief Fire Officer and strictly comply with recommendations before development commences.Compliance
- ,No advertising signs, structures or devices on the bridge or associated lift shafts/stairs without prior written approval from Planning Authority.Other
- ,Noise/vibration limited to BS 5228-1:2009+A1:2014 and BS 5228-2:2009+A1:2014. Dust levels < 350mm/m2/day per VDI 2119.Construction Management
- ,Development shall not impair existing drainage. No surface water runoff to public road or adjoining properties. Only clean surface water diverted to existing platform network.Wastewater Drainage
- ,Sign connection agreement with Irish Water prior to commencement. Comply with CDS Technical Documentation. Subject to Irish Water Capital Investment Programme constraints.Water Services
- ,No traffic/parking on public road during construction without agreement with Municipal District Engineer. Keep road/properties clean. No materials or plant on public road. Waste to licensed facility.Traffic Access
- ,Noise/dust emissions must not impair amenities beyond site boundary. Works within applicant's property unless written agreement from adjoining owners.Other
- ,Working hours: Mon-Fri 8am-6pm, Sat 8am-1pm. No activity Sun/Public Holidays. Deviation requires prior written approval.Construction Management
- ,Development contribution of €1,419.90 to be paid prior to commencement. Interest at 5% p.a. applies from grant date.Development Contribution
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / 07ae8063-c442-4fb5-ba3d-8b2934671d13.pdf / Document 112279Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / 306edc7c-184b-46da-9417-80f63800ed62.pdf / Document 111468Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 17228The development will consist of the construction of a new accessible passenger footbridge, with 2 no. stairs and 2no. lifts between the existing railway platforms / 0.0 km away / 14 September 2017Conditional grant
- 2460006The phased construction consisting of Phase 1A) the felling and removal of the existing car park trees, Phase 1B) The demolition of the existing single storey derelict house and the temporary relocation of the existing 50 space car park off site to the rear of Byrnes funeral directors on Railway Road and the temporary relocation of the existing single storey Portacabin beside the existing Gym building. Phase 2) The construction of the three storey school building of 8308 sqm gross internal area, consisting of general classrooms, locker areas, specialist classrooms, multi-purpose hall and associated fitness room, changing & storage facilities, a general purpose hall with an associated dining area and servery, library, a 4 class base Special Educational Needs (SEN) Unit and associated sensory garden, technology, construction studies & associated prep room, graphics, engineering, art, science and home economics classrooms, including ancillary stores, service areas, staff and administrative accommodation. The proposed school will include the provision of Heat Pumps with PV panel installations located on the new school roof. The provision of a new boundary wall, vehicular entrance & pedestrian access gate and associated set down area to the Old Dublin Road. Phase 3) The demolition of the remaining 2 storey gym and main school buildings including the 2 no single storey Portacabins and the construction of a new avenue, a new boundary wall, pedestrian entrance, and emergency vehicle access to Railway Road and 2 no new ball courts. 58 car parking spaces are proposed including 3 new universal design parking spaces, 150 bicycle spaces, biodiverse water management and attenuation systems, hard and soft landscaped areas, upgrading & refurbishment of existing boundaries, some new boundary walls, external store and ancillary site works / 0.1 km away / 30 August 2024Conditional grant
- 1887Planning Permission for Retention and completion of temporary car park at Old Dublin Road, Carlow. Works shall include revisions to the exiting entrance and entrance walls, site fencing and all associated site works. / 0.1 km away / 08 May 2018Conditional grant
- 18154Construction of single storey temporary accomodation to consist of 3 classrooms and a toilet block and all associated site works. / 0.1 km away / 19 June 2018Conditional grant
- 17268Demolition of 2no. Derelict dwellings at Old Dublin Road, Carlow, in order to provide additional playground space. Works shall also include revisions to the existing entrances and entrance walls, along with provision of school car parking, site fencing and all other associated site works. / 0.1 km away / 15 March 2018Conditional grant
- 20139The removal of existing toilet block extension to side of existing building and proposed construction of enlarged single storey extension comprising of replacement toilets, showers, tea station, and associated works / 0.1 km away / 02 July 2020Conditional grant
- 2560198Construction of a 211sq/m, single-storey building for the purpose of providing Funeral Industry training classes, and all associated site works. The proposed building will be ancillary to the existing funeral home and the proposed operating hours are 10:30 am to 7:30pm, Monday to Friday / 0.1 km away / 30 January 2026Conditional grant
- 22218Permission is sought for the construction of a proposed single storey extension(being a replacement/ reduction of permission granted 17/339) to existing community centre comprising of: additional consultation rooms/family room, additional offices, toilets, hallway to front of creche, removable of existing portacabin and associated works / 0.2 km away / 17 August 2022Conditional grant