20257: Retention Planning Permission is sought to retain replacement dormer style dwelling house as constructed, full planning permission is sought to upgrade existing septic tank to a proprietary treatment system and associated percolation area, all ancillary site works and services
The Ridge, Old Leighlin, Co. Carlow
DecisionConditional grant
Decided02 March 2021
Application typeRETENTION
Source documents5
Site
What is on file
0refusal reasons12conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- 1Retain development per approved plans received 28/07/2020, as amended 13/11/2020 and 05/02/2021.Compliance
- 2Permission strictly limited to submitted plans; does not cover other unauthorised development on the landholding.Compliance
- 3Dwelling must be occupied as permanent residence by applicant and immediate family for 5 years. S47 agreement and occupation statement required within 4 weeks of grant.Occupancy
- 4Condition text not captured in OCR. Reason cites requirement is in the interest of rural character and visual amenity.Design Materials
- 5Sight lines at road entrance per DMRB. Road opening licence required prior to commencement.Traffic Access
- 6Do not impair existing drainage. Surface water to soakways/system per BS 8301:1985 and BRE Digest 365 with inspection manholes.Wastewater Drainage
- 7Wastewater system per EPA Code of Practice 2009. As-constructed drawings and compliance certificate required before occupation. Technical specs for vents, distribution pipes, carbon filters, effluent filters, and grease traps apply. No surface water infiltration.Wastewater Drainage
- 8Strict separation of surface water and foul waste discharges.Wastewater Drainage
- 9If connecting to public network, sign Irish Water connection/self-lay agreement prior to commencement and comply with CDS Technical Documentation.Water Services
- 10All removed material disposed at licensed facilities by licensed operators.Construction Management
- 11Consult Chief Fire Officer within 4 weeks of grant and strictly comply with fire safety requirements.Compliance
- 12Pay development contribution of €2050.00 within one month of grant. Interest applies at 5% p.a. after 90 days.Development Contribution
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / F4a6d640-7331-4697-afe7-569ab6fa51ce.pdf / Document 109661Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / 56c836d5-fd5a-430d-bd4f-219d0702cd77.pdf / Document 109662Source PDF
- F I Request LetterSource: carlowcoco.eplanning.ie / 3239.pdf / Document 77695Source PDF
- F I Request LetterSource: carlowcoco.eplanning.ie / 3243.pdf / Document 77699Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 21470For the construction of a detached private dwelling, new site entrance, private well, sewage treatment and all other site and ancillary works / 0.8 km away / 10 May 2022Conditional grant
- 2268Permission for the construction of a straw shed and lean-to machinery shed and associated site works / 0.8 km away / 13 April 2022Conditional grant
- 21401To build a new dwelling house, domestic garage, new site entrance, septic tank treatment system, percolation area and all associated site works / 0.9 km away / 18 July 2022Conditional grant
- 19142For alterations to existing dormer bungalow (changes to windows, doors, roof, external finishes and to the internal layout), a proposed 2 story extension to the side and rear (part single storey also), proposed changes to all elevations, a new septic tank and percolation area, carport, domestic garage, private tennis court with surrounding fencing, domestic polytunnel, new site entrance, boundary treatments and all ancillary site works / 1.0 km away / 15 November 2019Conditional grant
- 18216Full planning permission for the construction of a 2 storey detached dwelling, garage, new site entrance, private well, sewerage treatment and all other site and ancillary works. / 1.1 km away / 18 October 2018Conditional grant
- 2143Permission for construction of a single storey dwelling with domestic garage, new entrance, proprietary waste water treatment system, bored well and all associated site works / 1.1 km away / 25 June 2021Conditional grant
- 2460069The construction of a slatted shed and associated site works / 1.1 km away / 08 October 2024Conditional grant
- 2460139Alteration of wall finish as granted under PL Ref:21/33, comprising of replacing natural stone finish with a rendered plaster finish, all ancillary site works and services / 1.3 km away / 29 August 2024Conditional grant