Conditional grantDecided 03 March 2021Carlow County Council

20281: For the construction of a bungalow dwelling, domestic garage, wastewater treatment system, bored well, new splayed entrance and all associated site development works

Augha, Nurney, Co. Carlow
DecisionConditional grant
Decided03 March 2021
Application typePERMISSION
Source documents4

Site

What is on file

0refusal reasons15conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • , Development to be carried out in accordance with plans received 13/08/2020 and amended by FI response 27/01/2021.Compliance
  • ,Permission authorises only the development detailed in the application, excluding other unauthorised development on site.Compliance
  • ,Dwelling to be first occupied as permanent residence by applicants/immediate family for 5 years. S47 agreement required prior to commencement.Occupancy
  • ,External finishes per drawing J697-PL04-001. Nap plaster neutral, roof blue/black or slate grey. No white uPVC for windows/doors/rainwater goods.Design Materials
  • ,Sightlines per DMRB. Road opening licence required prior to commencement for any public road works.Traffic Access
  • ,Surface water to soakaways/system per BS 8301:1985 and BRE Digest 365. No discharge to public road or adjoining properties.Wastewater Drainage
  • ,WWT system per EPA Code of Practice 2009. As-constructed certificate required prior to occupation. Minimum one flush out valve, effluent filter, no surface water infiltration, grease trap installed.Wastewater Drainage
  • ,Noise/vibration per BS 5228. Dust <350 mm/m2/day. Measures to prevent spread of alien invasive species during construction.Construction Management
  • ,Only clean surface water to soakpits/system; only foul/soiled water to WWT system.Wastewater Drainage
  • ,Connection agreement with Irish Water required prior to commencement if connecting to public network. Comply with Irish Water CDS Technical Documentation.Water Services
  • ,Off-carriageway parking for construction traffic. No parking on public road. Keep vehicles clean. Site litter-free.Construction Management
  • ,Construction hours Mon-Fri 08.00-18.00, Sat 08.00-13.00. No work Sun/Bank Holidays.Construction Management

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.