Conditional grantDecided 02 December 2020Carlow County Council

20295: Full planning permission for the construction of 'A' - a two and a half storey extension, (converted attic), to the rear of the existing structure, 'B' - a new accommodation staircase within the existing building and, 'C' - the construction of a single storey sunroom to the rear. Full planning permission is also sought for a mobile home to be temporarily placed on the site during the construction phase of the project. All with the associated site development works. A Protected Structure No. 10302410. RPS No. CW372

Knockduff House, St. Mullins, Co. Carlow
DecisionConditional grant
Decided02 December 2020
Application typePERMISSION
Source documents4

Site

What is on file

0refusal reasons13conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • ,1Development must be carried out in accordance with approved plans received 21/08/20 and amended by FI response 11/11/20.Compliance
  • ,2Mobile home is temporary on-site accommodation during construction and must be removed within 1 month of first occupation.Occupancy
  • ,3External wall and roof finishes per Drawing PP-2.02. Lime render neutral colour/texture. Slate roof blue/black or slate grey. No white uPVC for windows or rainwater goods.Design Materials
  • ,4Lines of sight at entrance to public road provided per Design Manual for Road and Bridges (DMRB).Traffic Access
  • ,5Only clean surface water to soakpit(s) or surface water system. Only foul/soiled water to wastewater treatment system.Wastewater Drainage
  • ,6No interference with roadside drainage without Municipal District Engineer agreement. No surface water runoff to public road or adjoining properties. Surface water collected to soakways per BS 8301:1985 and BRE Digest 365 with inspection manhole covers.Wastewater Drainage
  • ,7Sign connection/self-lay agreement with Irish Water prior to commencement. Comply with Irish Water CDS Technical Documentation. Subject to Irish Water Capital Investment Programme constraints.Water Services
  • ,8Adequate off-carriageway parking for construction traffic. No parking on public road. Prevent muck/dirt/debris on public road. Site kept neat and litter free. Noise and dust emissions controlled.Construction Management
  • ,9Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00. No work on Sundays & Bank Holidays.Construction Management
  • ,10Service poles relocated prior to construction at applicant expense. All ESB, telephone cables, service lines underground unless otherwise agreed.Traffic Access
  • ,11Consult Chief Fire Officer prior to commencement and comply with fire safety requirements.Compliance
  • ,12Development contribution of €338.90 for Domestic Extension (73.89m²) paid prior to commencement, plus interest at 5% p.a.Development Contribution

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.