2039: The construction of a rear extension to existing premises to include new storage area, ancillary office accommodation, new toilet facilities, kitchen facilities and seating area and incorporating internal alterations to existing shop layout and alterations to front elevation, electric car charging points and ancillary services associated with same
Bunclody Road, Tullow, Co. Carlow
DecisionConditional grant
Decided27 March 2020
Application typePERMISSION
Source documents5
Site
What is on file
0refusal reasons17conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- 1Development must follow submitted plans dated 10/02/2020, save as amended by conditions.Compliance
- 2Max retail floor area 100m². Two sliding door storage containers at rear western elevation must be removed off-site.Design Materials
- 3Any additional signage within site boundaries requires prior written agreement with the Planning Authority.Design Materials
- 4Submit a detailed Construction Management Plan for written agreement before starting works, covering phasing, compound, noise, traffic, and waste disposal.Construction Management
- 5Prevent debris spillage on adjoining roads. Provide adequate on-site parking for all construction, delivery, and service vehicles within the curtilage.Construction Management
- 6No heavy construction machinery before 08.00 weekdays/09.00 Saturdays or after 18.00 weekdays/13.00 Saturdays, nor on Sundays/Bank Holidays.Construction Management
- 7Site works restricted to Mon-Fri 08.00-18.00, Sat 08.00-14.00, no activity Sun/Public Holidays. Off-site noise limits: Day 55dB, Night 45dB. No tonal/impulsive noise.Construction Management
- 8Take precautionary measures to avoid damaging infrastructural services traversed by construction vehicles. Immediately repair any damage to Planning Authority's satisfaction.Construction Management
- 9Existing land and roadside drainage must not be impaired. Development designed and constructed to ensure efficient, uninterrupted drainage flow.Wastewater Drainage
- 10Provide 19 car parking spaces within the site, clearly delineated with thermo plastic paint.Traffic Access
- 11All ESB, telephone, and service cables must be located underground. Relocate existing poles in consultation with authorities prior to commencement at applicant's expense.Design Materials
- 12Sign Irish Water connection/self-lay agreement before commencement. Comply with CDS Technical Documentation. Connections subject to Irish Water Capital Investment Programme constraints.Water Services
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / A922f467-dee4-45ee-a96a-cb3f1f7128c6.pdf / Document 150899Source PDF
- Chief Executives OrderSource: carlowcoco.eplanning.ie / 3d650bc6-a26f-4093-ab5b-c32160047057.PDF / Document 75611Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / 5f3de615-a12f-4a11-a405-892148eefa5d.pdf / Document 111411Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / B1ddece4-a373-42ac-bbe3-de541204c55d.pdf / Document 150898Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 21195Permission for alteration to development permitted under planning reference 20/39 (under construction) to comprise of a change of use from retail to retail with ancillary off-licence use / 0.0 km away / 06 August 2021Conditional grant
- 2360065Permission to erect a 24m lattice telecommunications structure together with antennas, dishes and associated telecommunications equipment, all enclosed by security fencing / 0.1 km away / 13 September 2023Conditional grant
- 17189Planning permission to reconstruct existing partially demolished single storey dwelling (fire damage) while constructing a single storey extension to the front, side and rear, use of existing services and all associated site works / 0.3 km away / 19 September 2017Conditional grant
- 20422Construction of a portal type steel shed to be used as a store, connection services, and all associated site works / 0.3 km away / 21 May 2021Conditional grant
- 2560237The construction of an extension to the northeastern end of an existing manufacturing unit and all associated site works / 0.3 km away / 29 September 2025Conditional grant
- 22235Development at a site to the south-east of the Tesco Superstore, Tullow, Co. Carlow, which extends generally from Mill Street to the Tullow Wastewater Treatment Plant (WwTP), Tullow, Co. Carlow. The development will consist of (1) the decommissioning of: an existing siphon crossing underneath the River Slaney; Abbeywells Pumping Station (Abbeywells PS); a CSO overflow to the River Slaney near to Abbeywells PS; a CSO overflow to River Slaney near Millstreet junction from existing overflow chamber; an existing pumping main from Abbeywells PS to discharge manhole on N81; and an existing septic tank (2) the partial decommissioning of: an existing combined sewer network on the eastern and western sides of the River Slaney (3) the construction of: a new combined sewer network to connect eastern and western agglomerations to the proposed pumping station; a new gravity sewer crossing under the River Slaney to transfer flows from eastern agglomeration; a new Formula A network pumping station to pass flows to Tullow Wastewater Treatment Plant (Tullow WwTP); a new pumping main to transfer flows from the proposed pumping station to Tullow WwTP; a new storm storage chamber to contribute to a total of 450m3 of storage in the proposed pumping station site; a new overflow sewer from proposed pumping station to River Slaney; a new pumping station site to locate wet well, stormchamber, ESB substation, emergency generator and other ancillary equipment; new storm pumps to facilitate storm overflow discharge to River Slaney; new lifting gantries (2 no.) within the proposed pumping station site to facilitate the removal of the two sets of pumps; a site access route and associated gates; 2 no. car parking spaces; hard and soft landscaping and boundary treatment works; and all associated site development works and services on a site of 1.12ha. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted with the planning application. / 0.3 km away / 02 August 2023Conditional grant
- 19330The construction of an industrial unit, connection to existing site services and all associated and ancillary development works / 0.3 km away / 12 June 2020Conditional grant
- 22378Retention permission for a new front boundary wall, vehicular entrance with off street parking and all associated site works / 0.3 km away / 11 October 2023Conditional grant