22158: The construction of a new dwelling, domestic garage, onsite waste water treatment system, percolation area and all associated site and landscaping works at Kilmeaney, Tinryland, County Carlow.
Kilmeaney, Tinryland, Co. Carlow
DecisionConditional grant
Decided25 October 2022
Application typePERMISSION
Source documents4
Site
What is on file
0refusal reasons13conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- 1-4Dwelling must be occupied as permanent residence by applicant and immediate family for 7 years. Section 47 agreement required before commencement. Confirmation of first occupation required within 2 months. Mortgagee in possession or Development Plan consent exceptions apply.Occupancy
- 5-7External walls: smooth plaster, neutral colours, natural stone only on single storey rear. Roof: blue/black natural slate. Garage: smooth plaster, neutral colours, blue/black slate roof.Design Materials
- 8Garage use restricted to private domestic purposes incidental to the dwelling. No commercial, trade, industrial use or habitation permitted.Other
- 9Entrance/sightlines per submitted plan. Details for wing walls/piers/gates required. Kerb with 60mm upstand, aco-drain, and onsite surface water disposal mandatory. Road opening licence required. No interference with roadside drainage without approval.Traffic Access
- 10Landscaping per submitted plan. Retain existing trees/hedges. Double-row hedging with native shrubs and deciduous trees along boundaries. Planting in first season post-occupation. Replace failures within 3 years.Landscaping Boundary
- 11All services located underground. Relocate existing ESB/Telecom poles at applicant's expense prior to commencement.Compliance
- 12Consult Chief Fire Officer and strictly comply with all fire safety requirements prior to commencement.Compliance
- 13WWT system/percolation designed/maintained per EPA Code of Practice (2021). Minimum one flush out valve. Certificate of Compliance and 'as-constructed' drawings required before occupation. System tested per ILS EN 12566. No surface water infiltration. Grease trap installed.Wastewater Drainage
- 14Sign Irish Water connection agreement before commencement. Comply with Irish Water standards. Written approval for diversions/building over. Maintain separation distances per Codes of Practice.Water Services
- 15Pay development contribution of €7,075.00 prior to commencement. 5% annual interest applies from grant date to payment date.Development Contribution
- 16Provide onsite parking for plant/visitors. No road parking during construction. Maintain neat/litter-free site with skips. Use licensed waste operators. Keep roads/properties clean. No materials stored on public roads.Construction Management
- 17Prevent significant noise/dust impairment beyond site boundary. Works confined to applicant's property unless written agreements from adjoining owners are submitted.Construction Management
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / B1539f15-7354-48b3-b66f-58e19cd51eb1.pdf / Document 108750Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / Fb6bdd76-5019-42c8-8041-e1fb86fd4953.pdf / Document 108751Source PDF
- F I Request LetterSource: carlowcoco.eplanning.ie / 74f497de-a283-40eb-8fbf-ec2bb04652cf.pdf / Document 85853Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 17298Proposed alteration to an existing cottage, including demolition of existing extension and porch, proposed construction of part single storey, part two storey extension, proposed alteration to existing granted planning application 16/67 for a domestic wastewater treatment system and associated percolation area/polishing filter, alterations to site entrance and all associated site works / 0.1 km away / 17 January 2018Conditional grant
- 2560426A new single storey two bedroom dwelling, new residential site entrance, new waste water treatment system plus all associated site works including all over ground / underground services to facilitate the development / 0.3 km away / 06 May 2026Conditional grant
- 19358To erect a general purpose agricultural building (216 sq.m) and demolition of existing shed (91 sq.m) / 0.3 km away / 01 November 2019Conditional grant
- 2560206Retention planning permission is sought to retain the demolition of single storey sunroom to the rear of existing dwelling house, for the retention of the change of use of domestic garage including alterations to same for use as utility area ancillary to the dwelling house, retention planning permission is sought to retain the single storey extension as constructed to the rear of the existing dwelling house linking the original garage and the existing dwelling house, all ancillary site works and services / 0.3 km away / 09 September 2025Conditional grant
- 174Planning Permission for modifications to dwelling house to comprise of alterations to a bay window, extension to northern elevation, modifications to roof and and associated front elevation elements / 0.4 km away / 07 March 2017Conditional grant
- 17270Retention planning permission for a dormer style extension to the rear of existing dormer style dwelling and all associated site works. / 0.5 km away / 01 November 2017Conditional grant
- 2660025Construction of a part single storey, part two storey dwelling house, detached garage, new entrance, new waste water treatment system and percolation area, connection to mains water and all associated site works / 0.5 km away / 28 May 2026Conditional grant
- 1925To construct a part single storey, part two storey dwelling, detached double garage, new entrance, bored well, new waste water treatment system and percolation area and all associated site works / 0.5 km away / 25 June 2019Conditional grant