23111: Permission for the construction of a new single storey extension to our house, including internal and external alterations and all associated site works
Bealalaw, Myshall, Co. Carlow
DecisionConditional grant
Decided17 August 2023
Application typePERMISSION
Source documents4
Site
What is on file
0refusal reasons11conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- , Development must be carried out in accordance with plans received by the Planning Authority on 30/06/2023.Compliance
- ,Permission authorises only the extension detailed in the submitted plans and does not cover other development on site.Compliance
- ,External wall and roof finishes must match details on elevational drawing 23.101.15 received on 30/06/2023.Design Materials
- ,Existing tree and hedgerow planting on and bounding the site must be retained and maintained as currently in situ.Environment Ecology
- ,No interference with public road/footpath without Municipal District Engineer agreement; no materials stored on public road; Road Opening License required for any road openings.Traffic Access
- ,Surface water must be collected and disposed of to soakways or on-site surface water system per B.S. 8301:1985 and BRE Digest 365; must not infiltrate on-site wastewater system or discharge to public road/properties.Wastewater Drainage
- ,Only clean, uncontaminated surface water shall be discharged to soakpits/surface water system; only foul and soiled water to on-site wastewater treatment system.Wastewater Drainage
- ,Applicant must sign Irish Water connection agreement prior to commencement, comply with CDS Technical Documentation, and execute Build Over Agreements/Deed of Easement before any work begins.Water Services
- ,Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00; no work on Sundays or Bank Holidays without prior written approval.Construction Management
- ,Adequate off-carriageway parking for construction traffic; prevent debris on public road; maintain neat site with skips; control noise and dust emissions beyond site boundary.Construction Management
- ,Applicants must consult the Chief Fire Officer prior to commencement and strictly comply with his recommendations.Compliance
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / E88fb83a-eb85-423b-b33c-bd3ebc617fce.pdf / Document 102434Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / F9663425-9cf0-47c6-a057-132b841339ea.pdf / Document 102319Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / 22a91fb0-2b86-4f7b-aa7c-ea9b9169f57d.pdf / Document 102433Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 18295The construction of a new two storey split level dwelling, detached garage, new vehicular entrance, septic tank, percolation area and all associated site works and drainage / 0.4 km away / 17 December 2018Conditional grant
- 22152The construction of a single storey dwelling, a single storey domestic garage, septic tank and percolation area and all associated site and landscaping works / 0.7 km away / 30 June 2022Conditional grant
- 21365Permission for the construction of a new straw-bedded sheep shed and associated site works / 0.8 km away / 23 November 2021Conditional grant
- 18421For alterations to previously granted PL Ref. No. 17/365 (Provision of a 285m2 split level dwelling (single storey over basement) with new bored well, on-site septic tank and percolation area and associated site works including a new entranceway), consisting of a decrease in floor area of 28.06m2, revisions to all elevations of the dwelling house and revised landscaping plan / 1.1 km away / 02 January 2019Conditional grant
- 17365Planning permission for the provision of a 285m2 split level dwelling (single storey over basement) with new bored well, on-site septic tank and percolation area and associated site works including a new entrance way. / 1.1 km away / 26 April 2018Conditional grant
- 19477Permission for the continued use of an existing lattice type meteorological mast, 80m in height and associated instruments to measure local climatic conditions. Permission is sought for a period of 5 years. The mast was erected on site as exempted development pursuant to Class 20 (A), Part 1, Schedule 2 of the Planning & Development Regulations 2001 (as amended) on the 16th October 2018. / 1.6 km away / 18 June 2020Conditional grant
- 21385Retention of a single storey outbuilding to the rear of the dwelling / 1.7 km away / 02 December 2021Conditional grant
- 21350Permission for the construction of a one and a half storey dwelling, detached garage, on-site wastewater treatment system, bored well, new splayed entrance and all associated site development works. / 1.7 km away / 05 November 2021Conditional grant