Conditional grantDecided 14 November 2023Carlow County Council

23167: To construct a single storey dwelling, detached single storey garage, new entrance, bored well, waste treatment system & percolation area and all associated site works

Cappagh, Ballon, Co. Carlow
DecisionConditional grant
Decided14 November 2023
Application typePERMISSION
Source documents4

Site

What is on file

0refusal reasons13conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development must accord with plans received 02/10/2023 and be limited to those plans.Compliance
  • 3Dwelling must be first occupied as permanent residence by applicant and immediate family for 7 years. Section 47 agreement required prior to commencement.Occupancy
  • 4External finishes per Drawing PL-006-AC-23. Neutral plaster, locally sourced stone cladding. No white uPVC for windows/doors/rainwater goods.Design Materials
  • 6Driveway surface must be unbound gravel. Lines of sight per DMRB. Fence line set back 3m. Access onto L-6062 must be level.Traffic Access
  • 7Surface water drainage agreed with Municipal District Engineer. Aco drain at entrance. Surface water to soakways per BRE Digest 365. No surface water to public road/adjoining properties.Wastewater Drainage
  • 8Only clean surface water to soakpits. Only foul waste to wastewater treatment system.Wastewater Drainage
  • 9Wastewater system per EPA Code of Practice (P.E. ≤ 10) 7 June 2021. Certificate of Compliance required prior to occupation. Min 114m low pressure polishing filter piping. Grease trap required.Wastewater Drainage
  • 10Connection to public network requires Irish Water agreement and compliance with CDS Technical Documentation.Water Services
  • 11Off-carriageway parking for construction traffic. No parking on public road. Site kept neat/litter-free. Noise/dust controlled.Construction Management
  • 12Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00. No work on Sundays/Bank Holidays.Construction Management
  • 13Service poles relocated prior to construction. All ESB/telephone cables underground.Compliance
  • 14Consult Chief Fire Officer prior to commencement and comply with recommendations.Compliance