GrantedDecided 19 June 2024Carlow County Council

23195: To retain; (A) Change of use of permitted building from approved holiday home to self-contained permanent dwelling. Also, Planning permission for (B) Proposed new site entrance and change of site boundaries from previously granted positions. Original planning reference 01/688. Including all associated site works

Orchard Grove, Wells, Bagenalstown
DecisionConditional grant
Decided19 June 2024
Application typeRETENTION
Source documents5

Site

What is on file

0refusal reasons13conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be retained and carried out per plans received 13/12/2023 as amended by FI received 25/04/2024 and 24/05/2024.Compliance
  • 2Permission authorises only the development described in public notices and plans received.Compliance
  • 3House must be first occupied as permanent residence of applicant and immediate family for 7 years. Section 47 agreement required within one month. No development commences until condition met.Occupancy
  • 4Lines of sight at entrance per DMRB. Road opening licence per Guidelines for Managing Openings in Public Roads (2017) required prior to commencement.Traffic Access
  • 5Height of site entrance wing walls and piers shall not exceed 1.2 metres.Design Materials
  • 6Existing tree and hedgerow planting retained and maintained. New native hedge planting on boundaries per Site Layout P-101 within next planting season, replaced if failure occurs.Landscaping Boundary
  • 7Development shall not impair existing drainage. Surface water collected and disposed to soakways per BS 8301:1985 and BRE Digest 365. Only clean surface water to soakaways; foul waste to wastewater system.Wastewater Drainage
  • 8On-site domestic wastewater treatment system and percolation area/polishing filter designed, constructed, operated and maintained per EPA Code of Practice for PE ≤ 10 (7th June 2021). Surface water not allowed to infiltrate. Grease trap installed.Wastewater Drainage
  • 9Connection agreement with Uisce Éireann required prior to commencement if connecting to public network. Comply with CDS Technical Documentation. Divert/build over services need written approval. Separation distances per Irish Water Codes.Water Services
  • 10Off carriageway parking for all construction traffic. No parking along public road. Prevent muck/dirt on public road. Site neat and litter free. Noise and dust emissions not impair amenities.Construction Management
  • 11Construction hours restricted to Mon-Fri 08.00-18.00, Sat 08.00-13.00. No Sundays & Bank Holidays. Deviation only with prior written approval.Construction Management
  • 12Consult Chief Fire Officer within one month and comply with fire safety requirements.Compliance

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.