Conditional grantDecided 30 January 2024Carlow County Council

2360279: The part demolition and extension to the rear of an existing farm house, along with the installation of a new waste water treatment system, percolation area and all associate site and landscaping works

Ballybeg, Borris, Co Carlow
DecisionConditional grant
Decided30 January 2024
Application typePERMISSION
Source documents5

Site

What is on file

0refusal reasons13conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • , Development must be carried out in accordance with plans received 30/11/2023.Compliance
  • , External wall and roof finishes must match submitted elevation drawings (Drawing No. 23029 PL 006).Design Materials
  • , Permission is limited to the development detailed in the public notices.Compliance
  • , Site entrance layout, design, and sightlines must follow the submitted layout plan (Drawing No. 23029 PL 002).Traffic Access
  • , Retain existing mature trees/hedgerows; submit landscaping plan prior to commencement; use native planting; unbound driveway surface.Landscaping Boundary
  • , Do not impair existing drainage; contain surface water on-site per BS 8301:1985 and BRE Digest 365; route foul/soiled water to on-site treatment system.Wastewater Drainage
  • , On-site wastewater system must comply with EPA Code of Practice (PE ≤ 10); Certificate of Compliance required prior to occupation; I.S. EN 12566 testing; grease trap and activated carbon vent filters required; decommission existing septic tank.Wastewater Drainage
  • , Comply with Uisce Éireann connection agreements and CDS Technical Documentation if connecting to the public network.Water Services
  • , Provide off-carriageway parking for construction traffic; prevent debris on public road; maintain neat site; control noise/dust; remove waste by licensed collector.Construction Management
  • , Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00; no work on Sundays/Bank Holidays.Construction Management
  • , Consult Chief Fire Officer prior to commencement and strictly comply with recommendations.Compliance
  • , Relocate existing services/utilities as required; all service lines must be underground unless otherwise agreed.Other