Conditional grantDecided 10 July 2024Carlow County Council

2460048: The construction of a two-storey style dwelling house, domestic garage, proprietary sewage treatment system and percolation area, and connection to services and associated site works

Tomard Upper, Milford, Carlow
DecisionConditional grant
Decided10 July 2024
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons15conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development carried out in accordance with plans received 04/03/2024 and amended by FI response 14/06/2024.Compliance
  • 2Permission authorises only the development detailed in the application.Compliance
  • 3Dwelling first occupied as permanent residence of applicants/immediate family for 7 years. Section 47 agreement required prior to commencement. Written confirmation of first occupation within 2 months.Occupancy
  • 4External finishes per elevational drawings P004/P008. Plaster finish in neutral colour. No white uPVC for windows, doors, or rainwater goods.Design Materials
  • 5Garage used solely incidental to dwelling; not for self-contained living or commercial activity.Other
  • 6Landscaping per Plan P007. Boundaries planted with native deciduous hedging (no beech) in double rows at 400mm intervals. Maintained indefinitely. Completed in first planting season post-occupation.Landscaping Boundary
  • 7Driveway surface unbound gravelled (no concrete/tarmac). Lines of sight per DMRB and Plan P002 established prior to construction. Gateway per Drawing P008.Traffic Access
  • 8No interference with roadside drainage without Municipal Engineer agreement. Surface water contained on site per BRE Digest 365. Road openings require Licence.Wastewater Drainage
  • 9Clean surface water to soakpits/system. Foul/soiled water only to wastewater treatment system.Wastewater Drainage
  • 10Wastewater system per EPA Code of Practice (P.E. ≤ 10) 7 June 2021. Certificate of Compliance prior to occupation. Vents, max 6 distribution pipes, liquid levelling devices, activated carbon filters, grease trap required. No surface water infiltration.Wastewater Drainage
  • 11Connection agreement with Uisce Éireann required prior to commencement. Comply with Uisce Éireann Technical Documentation.Water Services
  • 12Off-carriageway parking for construction traffic. No road parking. Keep road clean. Site litter-free. Control noise/dust.Construction Management

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.