2460067: Development at a site at the entrance to the Tullow Wastewater Treatment Plant, Bunclody Road (N81), Tullow, Co. Carlow, R93 RY69 measuring approximately 0.14 hectares. The development will consist of [1] the retention of the existing ‘as built’ wall to the north and south of the site entrance to the Tullow Wastewater Treatment Plant; [2] the demolition of part of the ‘as built’ southern wall, fence and hardstanding; [3] the construction of a new realigned section of wall, concrete hand standing and fence to tie in with the remainder of the ‘as built’ wall, footpath and fence; and [4] hard and soft landscaping works and other associated site development works above & below ground necessary to deliver the development
A site at the entrance to the Tullow Wastewater Treatment Plant Bunclody Road (N81), Tullow, Co. Carlow
DecisionConditional grant
Decided10 May 2024
Application typeRETENTION
Source documents5
Site
What is on file
0refusal reasons8conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- 1Development to be retained/carried out per plans received 21 March 2024, except where altered by conditions.Compliance
- 2Prior to commencement, submit revised plans extending the new realigned southern wall by ~3m northward (12m to ~15m) for written agreement.Traffic Access
- 3New tree/hedge planting per landscape plan using native species, completed in first planting season, replaced if failed. Public facing wall to match existing stone finish.Design Materials
- 4Permission authorises only the development described in public notices and plans; does not relate to other development on site.Compliance
- 5Do not impair existing drainage. No surface water to road/adjoining properties. Collect/dispose to soakways or surface water system per BS 8301:1985 and BRE Digest 365 with inspection manholes.Water Services
- 6No traffic control measures or road/footpath interference without Municipal District Engineer agreement. No materials on public road/footpath. Road/hardstanding kept clean. Road opening license required per Guidelines 2017.Traffic Access
- 7Provide off-carriageway parking for all traffic. No parking on public road. Prevent muck/debris on road, keep vehicles clean. Site neat/litter free. Noise/dust limited per BS 5228 standards.Construction Management
- 8Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00. No work on Sundays/Bank Holidays. Deviation only with prior written approval.Construction Management
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / 98c99400-6ed1-4ce4-86f6-5bbdb5a1758e.pdf / Document 113091Source PDF
- Chief Executives OrderSource: carlowcoco.eplanning.ie / 27604e80-78e4-4788-a387-b022191efd12.pdf / Document 113093Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / Aceda25b-9ecd-4e01-a09f-86748dfa4c43.pdf / Document 115589Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / 0cadb0b7-4842-4e0e-87b7-7c984d1d6436.pdf / Document 113913Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 223Development at a site entrance to the Tullow Wastewater Treatment Plant, measuring approximately 0.0605 hectares. The development will consist of works to improve the visibility splay at the ertrance to Tullow Wastewater Treatment Plant, including; demolition of the existing boundary fencing; construction of new retaining boundary walls and new boundary fencing and the provision of a new grass verge along the N81. The development will also consist of the: relocation of existing road signage; relocation of utility and light standard poles; all hard and soft landscaping; and all other associated site excavation, infrastructural and site development works above and below ground including changes in level and boundary treatments / 0.0 km away / 28 September 2022Conditional grant
- 2460161The proposed development comprises the construction of: A) a 1062m2 warehouse extension to the south of an existing light industrial warehouse building; B) demolition of an existing 92m2 light industrial unit; C) a 105m2 extension to the west of an existing light industrial warehouse building; D) hard and soft landscaping, boundary treatments, and all associated works and site works to facilitate the development / 0.1 km away / 23 May 2025Conditional grant
- 2560035The proposed erection of a warehouse building including external signage and all auxiliary accommodation, a self-storage facility to the rear consisting of container units, the erection of paladin fencing to site boundaries including entrance gates together with all associated site works and landscaping / 0.2 km away / 10 April 2025Conditional grant
- 22378Retention permission for a new front boundary wall, vehicular entrance with off street parking and all associated site works / 0.2 km away / 11 October 2023Conditional grant
- 2269For the proposed erection of a warehouse building including external signage and all auxiliary accommodation, the erection of paladin fencing to site boundaries including entrance gate together with all associated site works / 0.2 km away / 07 April 2022Conditional grant
- 21308The construction of single storey extension to north and east elevations of existing office area with all associated site development works / 0.3 km away / 05 November 2021Conditional grant
- 2360004Retention Permission is sought for the as-built Extension to the west of the existing factory premises / 0.3 km away / 09 March 2023Conditional grant
- 20462Retention of the installation of an overflow service yard and for the position of windows as constructed from that granted under PL Ref No. 08/451 & 19/467 and for permission for a proposed vehicle entrance to serve and approved carpark (carpark granted under PL Ref No. 19/467) and the installation of PV Solar Panels to the roof together with all associated site works / 0.3 km away / 14 May 2021Conditional grant