Conditional grantDecided 10 October 2024Carlow County Council

2460072: Development at a 1.54ha site consisting of a 38kV/MV electrical substation, underground cables (UGC) & assoc. works. Development will include: 1)Construction of a substation compound of approx. 2,850m2 gross area, with 2.6m high palisade fence around entire perimeter of substation, with the following electrical plant within the substation: 1No. prefabricated 38kV GIS module & foundation (c.31m2 & c.5.2m high); 1No. prefabricated MV GIS module & foundation (c.32m2 & c.4.7m high); 1No. prefabricated Control Room module & foundation (c.32m2 & c.4.7m high); 2No. 38/20kV 10 MVA transformers & assoc. bunds (c.15m2, c.4.5m high ea.); Telecommunication SCADA pole of c.10 metres in height; assoc. & ancillary outdoor electrical equipment & other apparatus, incl. installation of UGC; Internal access road of c.40m in length & c.5m wide within proposed substation; Compound lighting, boundary treatment, assoc. drainage, landscaping & all ancillary site development works; 2)Use of a portion of existing temporary road (c.200m in length) permitted as part of recent MSD Rathgall development (Planning Ref: 21/360 & 22/110) for permanent use to facilitate access to proposed substation; 3)Construction of new stone wall, fencing & gates at existing junction of temporary road with public road; 4)Construction of internal access road (c.140m in length) to proposed substation extending from existing temporary road on MSD lands to proposed substation; 5)Site clearance works related to proposed substation compound & access road incl. removal of existing shed, store building & flat at rear of former B&B (c.376m2 & c.7.3m high), asphalt concrete yard adjacent to shed, septic tank, associated manholes & pipework, trees & hedgerow over a distance of c.8m to facilitate construction of new internal access road, 6)Installation of c.1.3km of double-circuit 38kV UGC along R448 road between proposed substation & existing Carlow–Graigue 38kV OHL; 7)Installation of c.0.7km of single circuit 38kV UGC along R448 road between proposed substation & existing Carlow–Ballylinan 38kV OHL; 8)Installation of c.0.3km of 6 circuit MV UGC along R448 road between proposed substation & existing R448 roundabout; 9)Installation of new 12m high steel lattice mast on existing Carlow–Graigue 38kV OHL; 10)Replacement of existing timber poleset (IMP1395) with new 15m high steel lattice mast on existing Carlow–Ballylinan 38kV OHL - located in Co. Kildare. Application is accompanied by a Natura Impact Statement (NIS)

The townlands of Ballyvergal and Pollerton Little County Carlow and Knocknagee County Kildare,
DecisionConditional grant
Decided10 October 2024
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons21conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in accordance with plans received 25/03/24, as amended by FI received 14/08/24.Compliance
  • 2Permission authorises only the proposed development as detailed in the received plans and particulars.Compliance
  • 3External elevations of prefabricated modules to be finished in dark green or light grey matt colour.Design Materials
  • 4(a) Landscaping/planting retained/maintained per 14/08/24 details. (b) Existing R448 hedgerow replaced with native hedgerow (min 5-years growth). (c) Security fencing finished in dark green matt colour.Landscaping Boundary
  • 5Prior to commencement, submit revised plans and detailed design for written agreement for uncontrolled pedestrian crossing point(s) at R448 roundabout arms.Traffic Access
  • 6(a) Engage qualified Archaeologist to monitor clearance/topsoil/groundworks. (b) Cease works if remains identified pending Authority decision. (c) Facilitate Archaeologist recording. (d) Submit final archaeological report. (e) CEMPs to include archaeological constraints and mitigation.Archaeology Heritage
  • 7(a) NIS and EcIA mitigation strictly adhered to. (b) Construction works comply with CIRIA C741, C532, IFI and NRA guidelines. (c) Inspect imported materials for invasive species. (d) Supervision by qualified environmental personnel/ecological clerk of works.Environment Ecology
  • 8Prior to commencement, submit two final CEMPs (Phase 1 & 2) for written agreement. Include detailed plans, sensitive receptor mitigation, noise/dust monitoring, programmes, emergency response, and weekly meetings with Municipal District Engineer.Construction Management
  • 9CEMPs, monitoring, auditing, record keeping and compliance reports to be available for inspection during construction upon request.Construction Management
  • 10Prior to commencement, submit final Resource and Waste Management Plan (RWMP) for written agreement.Construction Management
  • 11Flood Risk Assessment mitigation strictly adhered to. Floor levels minimum 300mm higher than predicted HEFS flood event – min 69.67 Mod.Compliance
  • 12(a) Best Practicable Means for noise/dust. (b) Site maintained neat/litter free. (c) Noise/dust emissions do not impair amenities beyond boundary. (d) Noise/vibration limited to BS 5228-1 & 5228-2. (e) Dust levels < 350 mm/m2/day per VDI 2119.Construction Management