Conditional grantDecided 31 March 2025Carlow County Council

2460087: The demolition of the existing entrance porch to a single-storey dwelling and the construction of a new relocated entrance porch, with all associated works

Sheean Garryhill, Muine Bheag, Co. Carlow
DecisionConditional grant
Decided31 March 2025
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons12conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • , Development must follow approved plans received 11/04/2024, as amended by FI (30/09/2024, 09/10/2024) and CFI (05/03/2025, 12/03/2025).Compliance
  • , External finishes must match elevation drawings received 11/04/2024.Design Materials
  • , Permission is limited to the development described in public notices and received plans; excludes other exempted development on site.Compliance
  • , Wastewater system must comply with EPA Code of Practice (PE ≤ 10). Upgrade required prior to works with Certificate of Compliance and as-constructed drawings. Septic tank tested per I.S. EN 12566. No surface water infiltration. Grease trap required. Minimum one flush out valve. Existing tank/area decommissioned.Wastewater Drainage
  • , No interference with roadside drainage. Surface water contained on site and disposed to soakways/system per B.S. 8301:1985 and BRE Digest 365. Foul waste only to public sewer.Wastewater Drainage
  • , Sightlines per Site Layout Plan (DWG. NO. PL2-100-01) submitted 05/03/2025. Realigned roadside boundary planted before construction starts.Traffic Access
  • , Off-carriageway parking for construction traffic. No parking on public road. Prevent muck/debris on road. Site kept litter-free. Noise/dust controlled. No materials on road without Engineer agreement. Road openings require Licence per 2017 Guidelines.Construction Management
  • , Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00. No work on Sundays or Bank Holidays.Construction Management
  • , All removed material disposed of at licensed facilities by licensed operators.Environment Ecology
  • , Applicant relocates existing services. All lines/cables underground unless agreed otherwise.Water Services
  • , Consult Chief Fire Officer prior to commencement and comply with fire safety requirements.Compliance
  • , Sign Uisce Éireann connection/self-lay agreement before commencement. Comply with CDS Technical Documentation.Water Services

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.