2460205: A 10 Year planning permission for a solar farm with a total area of circa 73 hectares in the townlands of Ballybar Lower, Ballybar Upper, Ballycarney, Ballyloo, Linkardstown, Park and Tinryland in County Carlow. The solar farm will consist of solar panels on ground mounted frames, 11 no. single storey electrical inverter/transformer stations, 3 no. single storey spare parts containers, 2 no. Ring Main Units, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L1010, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 3 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and L3050), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. entrances from the L1022 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farm proposed under Carlow County Council Reference 24/60043, but will not alter infrastructure proposed under that application. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application
In the townlands of Ballybar Lower Ballybar Upper, Ballycarney Ballyloo, Linkardstown Park and Tinryland
DecisionConditional grant
Decided24 April 2025
Application typePERMISSION
Source documents6
Site
What is on file
0refusal reasons36conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- 1Development per plans received 19/07/2024, amended by FI 28/02/2025.Compliance
- 2Parcel 1 omitted to safeguard Tinryland village expansion.Other
- 3Development to be carried out within 10 years of final grant.Compliance
- 440-year permission. Decommissioning and Restoration Plan required prior to commencement, including archaeological constraints. Removal within 3 months of decommissioning.Compliance
- 5NIS mitigation measures strictly adhered to.Environment Ecology
- 6No grid connection consent. Separate Roads Opening Licence required for public road cabling. Compliance with Purple Book and TII 2019.Traffic Access
- 7Permission limited to approved plans only.Compliance
- 8No artificial lighting. CCTV angled into site. Underground cables. Matt dark green inverter stations. No advertisement signs.Design Materials
- 9Materials, colours, textures, finishes of ancillary structures agreed in writing prior to commencement.Design Materials
- 10Final CEMP submitted for agreement, covering construction programme, monitoring, emergency response, weekly meetings, public liaison, archaeological constraints, and Waste Management Plan.Construction Management
- 11Prevent invasive species spread. Construction hours restricted (Mon-Fri 08:00-19:00, Sat 08:00-16:00). Vegetation clearance Sept-Feb. NPWS licence for nesting birds.Environment Ecology
- 12Revised Biodiversity Action/Management Plan agreed, including habitat restoration at adjoining waters and IFI engagement. Avoid wildflower seed mixes.Environment Ecology
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / Ecce542c-a1ed-49c7-8a23-9619ce8e2e03.pdf / Document 132355Source PDF
- Chief Executives OrderSource: carlowcoco.eplanning.ie / 4151e643-8b9f-4228-b395-0e6ba0f16b76.pdf / Document 132354Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / 71a26ecd-d1aa-4418-800d-caa8b42a56c2.pdf / Document 134500Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / 7a08e5b8-3663-47c6-b8b0-b0f6729294fb.pdf / Document 132595Source PDF
- F I Request LetterSource: carlowcoco.eplanning.ie / 1d58e18d-9960-422a-bff0-5ebfd78badb5.pdf / Document 121187Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2151Permission to retain the demolition of a garage, a new garage and the relocation of the entrance and all associated site works / 0.7 km away / 14 April 2021Conditional grant
- 2560137A 10 Year Planning Permission for a solar farm with a total area of circa 57 hectares. The solar farm will consist of solar panels on ground mounted frames, 8 no. single storey electrical inverter/transformer stations, 2 no. single storey spare parts containers, 1 no. Ring Main Unit, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L4038, L8185, R448, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 5 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and the Dublin - Waterford railway), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. existing entrances from the R448 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farms proposed under Carlow County Council References 24/60043 and 24/60205, but will not alter infrastructure proposed under these applications. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. / 1.1 km away / 31 October 2025Conditional grant
- 20123To demolish existing single storey dwelling and remove existing septic tank and shed, and construct a replacement single storey dwelling, revisions to existing entrance, new waste treatment system and percolation area, use of on-site mains water and all associated site works / 1.1 km away / 12 March 2021Conditional grant
- 2360003Retention permission is sought for the as built detached domestic garage to the rear of existing dwelling and all associated site development works / 1.1 km away / 07 March 2023Conditional grant
- 1780The retention and completion of the importation of soil for the purposes of land improvements at Park, Tinryland, Co. Carlow / 1.2 km away / 13 February 2018Conditional grant
- 20178Of 14/141 - for retention for road boundary and entrance with security gates, internal road network, parking facilities, tele sales portable buildings, maintenance portable buildings, canteen portable buildings and training area portable buildings, front extensions, side extensions, rear extensions, first floor extensions and ancillary plant services to existing processing unit, storage facility, bore well, proprietary effluent treatment system and ancillary works relocation ESB sub station and ancillary services. permission sought for storage area unit (dry store and fridge/freeze areas) etc. site development works, construction of internal road network and parking facilities, footpaths, connection and installation of telecommunications, electricity supply, the erection of street/yard lighting, the erection of site boundaries/sound barriers landscaping and ancillary services / 1.2 km away / 29 July 2020Conditional grant
- 2460073Retention Permission for the as constructed storage / collection area extension to south elevation of permitted commercial unit. Planning permission is sought for the construction of (a) extension consisting of a covered loading area to the north elevation of existing commercial unit, (b) extension consisting of covered loading area to the east elevation existing commercial unit (c) all associated site development works / 1.3 km away / 30 August 2024Conditional grant
- 2660025Construction of a part single storey, part two storey dwelling house, detached garage, new entrance, new waste water treatment system and percolation area, connection to mains water and all associated site works / 1.3 km away / 28 May 2026Conditional grant