Conditional grantDecided 27 February 2025Carlow County Council

2460239: The construction of a single-storey dwelling, associated effluent treatment plant and percolation area, erection of new site boundaries, construction of a new vehicular entrance and roadside boundary set-back together with all associated site development works

Ballinree, Borris, Co. Carlow
DecisionConditional grant
Decided27 February 2025
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons12conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in accordance with plans received 16/08/2024 and amended by FI response 09/02/2025.Compliance
  • 2Permission authorises only the detailed development and does not cover other exempted development on site.Compliance
  • 37-year owner-occupier condition. Section 47 agreement required prior to commencement. Statement of first occupation within 2 months.Occupancy
  • 4External finishes per drawing 24001-011-P1. Plaster finish neutral colour. No white uPVC. Reuse stone from historic ruins.Design Materials
  • 5Unbound gravelled driveway. Sightlines per DMRB and approved plan established prior to construction. Gateway per approved drawing. No interference with public road without Engineer agreement.Traffic Access
  • 6Do not impair roadside drainage without Engineer agreement. Surface water contained on site per BRE Digest 365. Only clean surface water to soakaways. Road opening licence required.Wastewater Drainage
  • 7Wastewater system per EPA Code of Practice (July 2021). Certificate of Compliance with as-constructed drawings prior to occupation. Septic tank tested per I.S. EN 12566. Grease trap, vent filters, liquid levelling devices, and distribution pipe limits specified.Wastewater Drainage
  • 8Connection agreement with Uisce Eireann required prior to commencement. Compliance with CDS Technical Documentation. Connections subject to Capital Investment Programme constraints.Water Services
  • 9Off-carriageway parking for construction traffic. No parking on public road. Prevent debris on road. Site kept neat/litter-free. Noise and dust controlled.Construction Management
  • 10Service poles relocated prior to construction at applicant expense. All cables underground except as agreed.Compliance
  • 11Consult Chief Fire Officer prior to commencement and comply with recommendations.Compliance
  • 12Development contribution of €1341.00 payable prior to commencement. 5% p.a. interest applies from grant date, first 90 days discounted.Development Contribution