Conditional grantDecided 11 February 2025Carlow County Council

2460404: To Renovate & Refurbish an existing derelict 2 storey dwelling to include: A/ Demolition and removal of existing 2 storey rear extension which is in bad repair. B/ Construct new 2 storey rear extension at the position of the existing extension where removal is sought. C/ Complete new Wastewater treatment plant with site works and ancillary services

Clogrennan, Carlow, County Carlow
DecisionConditional grant
Decided11 February 2025
Application typePERMISSION
Source documents5

Site

What is on file

0refusal reasons21conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Divert only clean surface water to suitably designed soakaways within the site boundary.Wastewater Drainage
  • 2Soakaways designed and installed per BRE Digest 365.Wastewater Drainage
  • 3Impermeable layer constructed on perimeter of the fully pumped sand polishing filter.Wastewater Drainage
  • 4Minimum one flush out valve on the polishing filter.Wastewater Drainage
  • 5Submit Certificate of Compliance prior to 1st occupation confirming system matches approved plans, including as-built drawings.Compliance
  • 6System designed, constructed, operated and maintained per EPA Code of Practice (PE ≤ 10) 2021.Wastewater Drainage
  • 7Certification that tank/system tested per I.S. EN 12566 and meets national annex requirements.Compliance
  • 8Surface water must not infiltrate the treatment system.Wastewater Drainage
  • 9Install domestic grease trap to prevent grease entering the treatment system.Wastewater Drainage
  • 10No surface water dispersed onto the public roadway.Wastewater Drainage
  • 11Decommission existing system once the new system is operational.Wastewater Drainage
  • aImplement CEMP, RWMP, and Demolition Plan; keep documents available for inspection on site during construction.Construction Management

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.