2560220: A 5-year permission for temporary development at Bendinstown (townland) in County Carlow. The development will consist of the installation of 3 no. single storey porta cabin units for use as office (2 no.) and storage space (1 no.), 6 no. car parking spaces and all associated site development works. The proposed development will serve the Garreenleen Solar Farm Development (as permitted under Carlow County Council Reference 20/143 / An Bord Pleanála Reference ABP-307891-20). The proposed operational development will be accessed via the L7112 local road via the entrance permitted under An Bord Pleanála Reference ABP-313139-22
Bendinstown, (townland), Co Carlow
DecisionConditional grant
Decided23 September 2025
Application typePERMISSION
Source documents5
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / Bc7a4283-7e81-40bd-a12d-35316c133cb8.pdf / Document 139795Source PDF
- Chief Executives OrderSource: carlowcoco.eplanning.ie / 6cbcc6e1-4774-4d6d-a364-4dc0cfad95c4.pdf / Document 139794Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / 9fd76e0a-039c-4e76-890a-4b3da4d13480.pdf / Document 141531Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / 8d8a546a-a484-4e65-a339-9739bb34c3b2.pdf / Document 139808Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 22199To apply for a 10 year permission for the proposed development of an underground electricity interconnector cable. The proposed development of the underground electricity interconnector cable will comprise 1 no. 33kV triple circuit cable of c.92 metres in length which is to be installed in an excavated trench including underground ducting and all associated site development and reinstatement works. The proposed development represents a minor revision to the approved layout of the solar farm previously permitted under Carlow County Council planning reference 20/143 and An Bord Pleanala Reference 307891-20 comprising the laying of underground cabling in the previously permitted grassed field area. The purpose of the proposed development is to facilitate the interconnection from the permitted solar farm to a 110kV substation which is the subject to the application to An Bord Pleanala (Reference VA01.313139) A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. / 0.1 km away / 09 August 2022Conditional grant
- 20291For a single storey / part storey & half dwelling, septic tank and percolation area, new vehicular entrance, bored well and all associated site works / 0.5 km away / 30 November 2020Conditional grant
- 2660042An agricultural entrance & all associated works for access to existing farmyard / 0.8 km away / 12 May 2026Conditional grant
- 1932Single storey dwelling, domestic garage, septic tank and raised percolation area, new vehicular entrance and all associated site works / 1.0 km away / 23 May 2019Conditional grant
- 22418The construction of a new two storey dwelling house, connected 'Granny flat', double garage, septic tank with percolation area, the reconstruction of existing site entrance and all associated ancillary works / 1.0 km away / 05 July 2023Conditional grant
- 2017For a new vehicular entrance, driveway and all associated site works / 1.0 km away / 19 March 2020Conditional grant
- 21505Permission for development for a part single storey / part two storey dwelling, waste water treatment system and percolation area, new vehicular entrance and all associated site works / 1.2 km away / 31 March 2022Conditional grant
- 2560036The installation of six LED lighting poles (approximately 18 meters in height with a maximum output of 590 lux) to replace and upgrade the existing eight lighting poles, which will be removed, including all associated development works / 1.3 km away / 30 June 2025Conditional grant