2460077: For Electrical Infrastructure Upgrade Works on the hospital campus which includes: 2no. new Substations. Substation Building 1 is located to the south west of the site and includes an associated compound and a containerised generator. Substation Building 2 is located to the north of the site and includes an associated compound and a containerised generator. In the location of Substation Building 2 works also include a new water tank, pumphouse, a new oil tank with associated fencing, and a gas compound containing 4no. gas tanks
Cavan General Hospital, 2 R212 Lisdarn, Co. Cavan
DecisionConditional grant
Decided14 June 2024
Application typePERMISSION
Source documents8
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: cavancoco.eplanning.ie / 4414eb5c-f83e-45d2-9afb-f1975ec1ac5a.pdf / Document 418215Source PDF
- Chief Executives OrderSource: cavancoco.eplanning.ie / Aaa301c9-76dc-482e-87f8-bbf76fe92769.pdf / Document 414665Source PDF
- Chief Executives OrderSource: cavancoco.eplanning.ie / Da31d088-1553-4d23-ac59-e76a35d729a3.pdf / Document 418214Source PDF
- Final GrantSource: cavancoco.eplanning.ie / C5a11f33-750b-4a17-adbc-82c38882f347.pdf / Document 420996Source PDF
- Planners ReportSource: cavancoco.eplanning.ie / B3606fc7-1249-4e32-91a3-a1c961ad2aa0.pdf / Document 414670Source PDF
- Planners ReportSource: cavancoco.eplanning.ie / 596c18cd-a17f-4558-ae54-74fdafae31d1.pdf / Document 418216Source PDF
- F I Request LetterSource: cavancoco.eplanning.ie / 56260609-0ac5-4c7f-b192-f175279f436e.pdf / Document 414664Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 22103For a 5,236 sq. m. three storey extension, with plant room at roof level, together with all necessary ancillary site works. The extension shall comprise of Emergency Department at Lower Ground Floor level, Endoscopy Unit and link corridor at Ground Floor Level, Inpatient Bed Ward at First Floor Level and Plant Room at Roof Level. It will also include the installation of Photovoltaic Panels on the roof of the existing hospital. The site works will include the provision of a carpark adjacent to the extension comprising 44 car spaces, 5 motorbike spaces and bicycle bay and a carpark comprising 150 parking spaces on the internal access road to the east of the extension / 0.0 km away / 04 May 2022Conditional grant
- 2560714For the construction of a standalone bus shelter and all ancillary site development works / 0.0 km away / 30 January 2026Conditional grant
- 19100For the following works: change of use of existing laundry building to be used as a medical file store, to carry out alterations to existing building and undertake associated site works / 0.0 km away / 09 May 2019Conditional grant
- 2560575- RED III - for the construction of a single storey geothermal plant building with an associated yard area including access stairs. The Geothermal plant building will house ground source heat pumps and will be connected by buried pipework to a series of geothermal boreholes located to the south of the existing hospital. This Geothermal Plant is set to serve the previously granted Cavan General Hospital extension planning application, Ref-2460276. The application includes all associated boundary treatments, landscaping, and site development works necessary to facilitate the installation and integration of the development within the hospital grounds / 0.1 km away / 18 November 2025Conditional grant
- 2560592For (a) a single storey modular structure at first-floor level containing a laboratory (b) PERMISSION for the construction of an extension to this modular building comprising a further single storey modular structure at first floor level containing a new laboratory; connection to existing services, and all associated site development works / 0.1 km away / 25 November 2025Conditional grant
- 2460276For the development of 7,588sqm accommodation, will comprise the following: 1) New 5 storey extension to accommodate an Emergency Department at Lower Ground Floor, an Endoscopy Unit at Ground Floor, Inpatient Ward Accommodation at First, Second and Third Floor, and Plant area at Fourth Floor 2) A link corridor to connect the proposed extension at ground floor level to the existing hospital at lower ground floor level. 3) External ASHP Compound and Plant 4) Waste Hold 5) Switch room constructed independently to the main build 6) 37 no. car parking spaces (including 10 no. accessible spaces and 4 no. EV charging spaces) 7) 7 no. motorbike spaces 8) All boundary treatments, vehicle and pedestrian accesses, landscaping, and associated site development works / 0.1 km away / 11 February 2025Conditional grant
- 22337For the construction of 2 number storage buildings and all associated site development works at / 0.1 km away / 02 November 2022Conditional grant
- 2460209For a 1569 sq. m two-storey Enhanced Community Care Hub with plant room at roof level, together with all necessary ancillary site works. The development shall comprise of 25 no. clinical rooms and gymnasium at ground floor level. Ancillary facilities including lobbies, reception, waiting areas, education rooms, admin offices, storerooms, comms room, toilets, staff lounge and staff changing facilities. PV panels and green roof at roof level. 50 no. car parking spaces including 5 no. accessible parking spaces, and one bicycle stand. All boundary treatments, vehicle and pedestrian accesses, landscaping, and associated site development works / 0.2 km away / 14 February 2025Conditional grant