22109: To Extend the Appropriate Period for Planning Permission P16/555 for the construction of a tyre repair and replacement garage facility including ancillary site works
Cloghlea, Sixmilebridge, Co Clare
DecisionRefused
Decided04 April 2022
Application typeEXTENSION OF DURATION
Source documents3
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: clarecoco.eplanning.ie / 6d88e0c9-fbcd-4fc0-9823-20c9e1d370d7.pdf / Document 598033Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 4149fad3-e4aa-4a3a-9c48-5ed121455d5a.pdf / Document 598034Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 22482To construct a new dwelling house and private garage, new entrance and install a new wastewater treatment system along with all associated site works / 0.4 km away / 03 October 2022Refused
- 18180To RETAIN an Advertising sign at this address / 0.4 km away / 01 May 2018Refused
- 19800To construct a dwelling house and garage, with effluent treatment system, new entrance from public road and all associated site works / 0.8 km away / 10 March 2020Refused
- 18886To construct a 2 storey dwelling house, detached garage, vehicular entrance, effluent treatment system including all associated site works and services / 0.9 km away / 20 December 2018Refused
- 19931To construct 2 no. detached dwelling houses complete with detached domestic garages, effluent treatment systems, vehicular entrances, including all associated site works and services at Deerpark / Corlack Cluster, Sixmilebridge (as defined in the Clare County Development Plan 2017-2023) / 0.9 km away / 30 January 2020Refused
- 22188To construct a single dwelling house, garage and advanced wastewater treatment system along with ancillary site works / 1.3 km away / 01 July 2022Refused
- 2660256To construct a dwelling house, domestic garage, waste-water treatment system and soil polishing filter together with all associated site development works and connections to public services / 1.9 km away / 15 June 2026Refused
- 2560560For a proposed solar farm development which is located across the townlands of Ballycunneen, Drumline, Ballycasey More, Clonmoney West, Firgrove, and Ardkyle, in County Clare. The development will consist of: • Linear arrays of solar PV panels on ground mounted steel supported structures with associated cabling and ducting (including underground cable grid connection to the Drumline 110kV substation); • 2 no. Horizontal Directional Drilling (HDD) locations associated with interconnecting cable routes; • 11 no. proposed single storey MV stations; • A co-located Battery Energy Storage System (BESS) installation (including 20 No. containers with cells and 5no. containers with PCS MV stations); • Site perimeter fencing; • Palisade double security gates at all temporary (3No.) and permanent (3 Nno.). site entrances; • Site access tracks including passing and turning bays; • On-site pole mounted CCTV cameras; • 2no. temporary construction compound/carpark/material storage areas with associated temporary site offices, parking areas and security fencing; • 8 no. steel storage containers; • 5 no. turning bays; • 3 no. temporary construction stage wheel wash systems; • Temporary soil storage areas; and • All associated and ancillary works. The proposed solar farm development spans a total site area measuring 98ha. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of Solar PV on the site is estimated to be up to 60MW. The development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413). x YES NO If YES above, important to note that the planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Appropriate Assessment Screening Report (AASR) and Natura Impact Statement (NIS) has been prepared for this development and submitted with this planning application / 2.0 km away / 17 December 2025Refused