22621: To demolish an existing dwelling house and outbuildings and to construct a replacement dwelling, with all associated works
Cahermurphy, Kilmihil, Co Clare
DecisionRefused
Decided02 September 2022
Application typeOUTLINE PERMISSION
Source documents4
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: clarecoco.eplanning.ie / Fc113b7f-1981-4417-9dd7-4d845e510a79.pdf / Document 621903Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 028dea5b-50ac-4994-89d5-559d2642d327.pdf / Document 621904Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 2a021605-dd38-452f-8185-5f1849e34a96.pdf / Document 621905Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 20658For the development of a windfarm in the townlands of Cahermurphy, Knocknahila More South, Carrownagry South, Caheraghacullin and Drummin, together with the development of an underground grid connection cable to the National Grid in the townlands of Cahermurphy, Drummin, Doolough, Glenmore, and Booltiagh. The development will consist of 1. Construction of up to 10 no. wind turbines with a maximum overall blade tip height of up to 170 metres and associated hard strand areas. 2. 1 no. permanent meteorological mast with a maximum height of up to 100 metres. 3. 1 no. 38kV permanent electrical substation which will be constructed at one of two possible locations on site: either Option A in Carrownagry South townland or Option B in Cahermurphy townland. The electrical substation will have 1 no. control building with welfare facilities, all associated electrical plant and equipment, security fencing, all associated underground cabling, waste water holding tank and all ancillary works. 4. All associated under-ground electrical and communications cabling connecting the turbines to the proposed on-site substation. 5. All works associated with the connection of the proposed wind farm to the national electricity grid via an underground cable to the existing Booltiagh 110kV substation. 6. Upgrade of existing tracks, roads and provision of new site access roads and hardstand areas. 7. Junction access road works. 8. 2 no. borrow pits. 9. 1 no. temporary construction compound. 10. Site Drainage. 11. Forestry Felling to facilitate construction and operation of the proposed development; and 12. All associated and ancillary site development works. The application is seeking a ten year planning permission and 30 year operational life from the date of commissioning of the wind farm. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed developemnt / 2.2 km away / 15 July 2021Refused
- 20109To extend existing private garage and convert it into a granny flat along with all associated site works / 4.4 km away / 08 April 2020Refused
- 21392The development will consist of a dwelling house, c/w private garage and all ancillary site works / 4.6 km away / 17 June 2021Refused
- 2268For the development which will consist of a dwelling house, a private garage, connection to the public sewer and ancillary site works / 4.6 km away / 28 March 2022Refused
- 21393The development will consist of a private dwelling c/w private garage and ancillary site works / 4.6 km away / 17 June 2021Refused
- 22613To construct a cottage and garage with on-site wastewater treatment, a new shared entrance and ancillary groundworks / 4.8 km away / 31 August 2022Refused
- 2460379To construct a granny flat with its own sewage treatment system and ancillary works / 5.6 km away / 07 October 2024Refused
- 17320To develop new site entrance, erect dwelling house, foul sewer treatment plant and percolation area / 5.6 km away / 03 October 2017Refused