22810: To erect signage to logistics (warehouse and distribution) building
Shannon Free Zone, Ballycasey Beg, Smithstown Shannon
DecisionConditional grant
Decided03 November 2022
Application typePERMISSION
Source documents5
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: clarecoco.eplanning.ie / F1a5baa0-0a68-4366-a18d-9e5542b4b47f.pdf / Document 631645Source PDF
- Final GrantSource: clarecoco.eplanning.ie / 4d324dd9-1130-4bb0-bd3a-28937b5e1af5.pdf / Document 638345Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 7aa92e84-cfb8-4ba5-ad68-b9f7ce6f1aa2.pdf / Document 631647Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 5b40cf8b-df5c-4b6c-b3dd-0f19a42f1feb.pdf / Document 631648Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 19994To construct logistics (warehouse and distribution) building with photo-voltaic arrays on the roof with supporting offices, signage, flag poles, HGV, car and cycle-parking, service yard, new vehicular entrance/exit, connection to existing estate sewers, ESB sub-station, landscaping, boundary treatment and all ancillary site works necessary to facilitate the proposed development / 0.0 km away / 21 February 2020Conditional grant
- 22330For the construction of a detached single storey garage with single storey granny flat appended, connection to existing wastewater treatment system and percolation area, and all ancillary site and landscaping works / 0.2 km away / 01 June 2022Conditional grant
- 2560472For an external plant compound enclosed with a security fence to include Air Conditioning Units with condensers and dedicated outdoor air system on existing roof plant area, Chillers, Thermal Storage Tanks, Pump house, Generators, Transformers, and all ancillary site works / 0.2 km away / 12 November 2025Conditional grant
- 22297To retain air handling unit located to rear of building and 2 no. chiller units with shed located to side of building; and planning PERMISSION for generator located to rear of building, 5 no. chiller units with new shed to side of building, high level louvre panels to existing building and all ancillary site works / 0.2 km away / 23 May 2022Conditional grant
- 21141For works which shall consist of; an extension to the eastern elevation measuring 870m2 to contain new clean room and dispatch facilities, a two-storey extension to the northern elevation measuring 580m2 ground floor an 395m2 first floor to contain new staff welfare facilities, a single storey extension to the northern elevation measuring 640m2 to contain additional warehousing space, a new staff car park with 320 spaces shall be constructed to the north (rear) of the site and accessed by means of a new entrance. A separate new goods entrance shall be constructed to the front of the site to the east of the existing staff entrance. All site ancillary works including temporary relocated car park spaces and access to same / 0.3 km away / 03 November 2021Conditional grant
- 2460554For works to the existing facility at Building 2, East Park, Shannon Industrial Estate, Shannon, Co. Clare. The proposed development consists of: -A two-storey manufacturing expansion 13m high with a footprint of 2168.125 m2 and an overall floor area of 4340 m2 over two floors located to the North and adjoining the existing facility. - The facility shall be clad in micro-rib external cladding to match existing and contain a single loading dock arrangement on its western elevation. - A single storey electrical room measuring 12m x 5m x 3m high constructed from block cavity construction and completed with a built up concrete flat roof shall be located on the eastern side and adjoining the new development. - A single storey metal clad steel structure to house new equipment measuring 12m x 7m x4m high and located on the northern elevation of the existing building adjoining the new development. - A new perimeter roadway extending into the existing northern fallow area. - All associated site works and temporary works / 0.3 km away / 26 May 2025Conditional grant
- 2265For development at the existing facility at Building 2, East Park, Smithstown, Shannon, Co Clare. The development will consist of: Installation of a 13MW solar photovoltaic system on the roofs of the Zimmer Biomet premises, along with the associated fixing and mounting systems. Installation of a battery energy storage system to comprise of 2 no. inverters and 2 no. 1.04MWh Batteries. Installation of a back-up generator. Installation of 2 no. transformers. All ancillary development including the construction of supporting concrete plinths, perimeter palisade fencing, electrical cabling, on-site drainage and the relocation of an existing storage unit / 0.3 km away / 23 March 2022Conditional grant
- 1790To maintain the existing 30 metre high, free standing lattice communication structure, carrying antennae and communication dishes within an existing 2.4 metre high chainlink fence compound previously granted temporary permission LPA Ref P12/282 at ESB Telecoms Ltd telecommunication compound at ESB Drumline 110 kV Substation, Drumline, Shannon / 0.3 km away / 04 April 2017Conditional grant