23458: For the following works: to construct a new pedestrian access gate, gravel walkway, timber post and rail fence and all associated site works. This development is located within the East Burren complex SAC. A Natura Impact Statement will be submitted to the planning authority as part of this planning application
Attyslany South, Tubber, Co Clare
DecisionRefused
Decided18 October 2023
Application typePERMISSION
Source documents6
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: clarecoco.eplanning.ie / Beb327e6-4907-4bf0-8a04-990184f3f413.pdf / Document 695389Source PDF
- Chief Executives OrderSource: clarecoco.eplanning.ie / 6bf928b7-8095-47ab-a01b-da164c7b6741.pdf / Document 695390Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 183612a8-d7d5-46f9-8f29-addd71a4d671.pdf / Document 695392Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / F0aa939e-8788-4311-9098-cea09d473e64.pdf / Document 695393Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / C1ad6b5f-ea69-4ffd-a03c-df4c2ec843a2.pdf / Document 695394Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 25243To build a new house, garage, install a waste water treatment system and all associated and ancillary site works / 4.3 km away / 15 September 2025Refused
- 2625To Extend the Appropriate Period of Planning Permission for P20/385 for development consisting of demolition of existing sheds, construction of extensions and alterations to an existing house and installation of a new wastewater treatment system along with all associated ancillary works. / 7.1 km away / 27 March 2026Refused
- 251To extend the appropriate period of Planning Permission P19/782 the development will consist of; (A) construction of 20 residential units comprising of: 4 no. 2 storey 4 bedroom detached units; 2 no. 1 storey 3 bedroom detached units; 2 no. 2 storey 4 bedroom semi-detached units and 12 no. 2 storey 3 bedroom semi-detached units. (B) The proposed development also includes public realm landscaping including shared public open space and public lighting, (C) provision of all associated surface water and foul drainage services and connections ancillary to the residential development, (D) pedestrian access, vehicular access, new footpath and zebra pedestrian crossing from the Ballinruan Road, Crusheen, as well as all associated site development works and services. The planning application is accompanied by a Natura Impact Statement. / 8.7 km away / 28 February 2025Refused
- 20145To construct a single dwelling house, attached garage, advanced wastewater treatment system and ancillary site works / 9.0 km away / 05 June 2020Refused
- 20124To (a) Demolish existing sheds (b) alter and extend existing dwelling house, install new wastewater treatment system and soil polishing filter together with all ancillary site development works and services / 10.0 km away / 31 March 2020Refused
- 20842To renovate and extend an existing cottage, construct a private garage, new entrance and driveway and install a new wastewater treatment system along with all associated works / 10.2 km away / 22 April 2021Refused
- 23324To construct a replacement single storey dwellinghouse, bored well, wastewater treatment system, entrance, and demolish existing partially constructed dwelling along with all ancillary site works / 10.9 km away / 28 September 2023Refused
- 22745To construct a single storey dwelling house, entrance and access road, bored well, wastewater treatment system and polishing filter, and ancillary site works / 11.1 km away / 24 February 2023Refused