2560666: For the following works at existing site in Crag, Lissycasey, Co. Clare. a) demolition of existing damaged rear and side extensions to the existing dwelling and demolition of a section of existing derelict dwelling, b) alterations to floor layouts, elevations, and roof structure of the existing dwelling, c) construction of new rear and side extensions to the existing dwelling, d) alterations and addition of an extension to the existing derelict dwelling, e) install new percolation area and treatment plant to serve the dwellings, f) all ancillary works related to the development
Crag, Lissycasey, Co. Clare
DecisionConditional grant
Decided19 March 2026
Application typePERMISSION
Source documents9
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: clarecoco.eplanning.ie / A292b1bf-7c43-4c1e-a2f8-26465e686772.pdf / Document 875708Source PDF
- Chief Executives OrderSource: clarecoco.eplanning.ie / Ff92ef29-7818-4c0c-8c07-3404beebf2da.pdf / Document 858539Source PDF
- Chief Executives OrderSource: clarecoco.eplanning.ie / Fc55bc82-2670-4b57-9a8e-1028a2553eab.pdf / Document 875707Source PDF
- Final GrantSource: clarecoco.eplanning.ie / B92c00a2-66a3-4fcf-9ecf-bfdaa33aba37.pdf / Document 883454Source PDF
- Planners Report / file 1 of 2Source: clarecoco.eplanning.ie / 5dacbcc2-220c-41c0-a680-0929f85a2099.pdf / Document 858538Source PDF
- Planners Report / file 2 of 2Source: clarecoco.eplanning.ie / 0a1fb970-abc6-4ffb-818c-72ca971f90ae.pdf / Document 858538Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 6a76480e-cfcb-41c0-9d7d-3261a12b7e69.pdf / Document 875706Source PDF
- F I Request LetterSource: clarecoco.eplanning.ie / 13918b7d-7598-430a-9653-c51c34b92fb4.pdf / Document 858540Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460189For development which will consist of modifying the extensions from those previously granted under Planning Application P21/1113 along with ancillary works / 0.7 km away / 25 June 2024Conditional grant
- 211113To (a) demolish an existing garage and (b) permission to construct extensions to the front and side of an existing dwelling house along with alterations to the existing dwelling including lifting the roof to incorporate first floor living accommodation and (c) permission to construct a new garage, along with ancillary works / 0.7 km away / 13 December 2021Conditional grant
- 2360034To construct a new dwelling house, access road, entrance, private garage and install a new wastewater treatment system along with all associated works / 1.2 km away / 16 May 2023Conditional grant
- 25407For development of a livestock slatted unit and a silage slab with apron and associated ancillary site works / 1.5 km away / 18 February 2026Conditional grant
- 211057For development in the townlands of Crossmore, Derrynageeha, Ballyduneen, Carrowreagh West, Corraige, Knockalough, Crag, Furroor, Boolynamweel, Illaunatoo or Sorrelisland, Boolynaknockaun, Glenmore and Booltiagh. The Development will consist of: 1. A 38kV electrical connection over a total of approximately 11km, from the permitted Crossmore Wind Farm (planning ref: P09/123, as extended under planning ref: 19/388 and altered by P20/824) to the existing 110kV Booltiagh substation. This connection will consist of approximately 10km of overhead line and associated 97 no. wooden polesets (single, double and triple structures with approximate heights between 14-19 metres), and approximately 1km of underground cabling. The cable will travel underground within the wind farm site (in the townlands of Cross More and Derrynageeha), underground on private lands (in the townlands of Boolynamweel, Illaunatoo and Boolynaknockaun) and under the public road prior to entering the Booltiagh substation (in the townlands of Boolynaknockaun and Booltiagh). 2. Roads and access arrangements/works consisting of: a) Creation of new permanent access gate into private lands off the L6180 local road; b) Construction of new access roads to facilitate provision of the grid connection, to be retained for permanent use; and c) Upgrade of the existing public road network for turbine delivery including; I. Junction improvement works at the N68 and L6180; II. Widening along the L6180. 3. The proposed development also incorporates construction of the following elements at the site of the permitted 7-turbine Crossmore Wind Farm (ref: P09/123, as extended by P19/388, and altered by P20/824) which will have a 25 year operational lifespan from the date of commissioning: a) Provision of a permanent 38kV substation north of permitted Turbine 5 in lieu of previously approved substation located south of Turbine 2; b) Redesign of permitted turbine hardstand areas consisting of additional temporary hardstand areas for blade storage; c) Provision of 2 no. temporary construction compounds; d) Proposed upgrade of existing access road and proposed new areas of access road between permitted Turbines no. 5 and no. 6, in lieu of permitted upgrade of existing access road between permitted Turbines no. 2 and no. 5; e) All associated underground cabling between permitted turbines and relocated substation, and; To view remainder of description please view newspaper notice. / 1.6 km away / 07 April 2022Conditional grant
- 18928To construct a new dwelling house, private garage, entrance and sewerage treatment facilities along with all associated works / 1.6 km away / 08 January 2019Conditional grant
- 22720To demolish existing shed and barn, construct a new dwelling house and garage, construct a new entrance and modify existing farm entrance, install a new sewerage treatment system along with all associated works / 1.7 km away / 27 March 2023Conditional grant
- 21136To RETAIN the following alterations to dwelling house (a) Sunroom as constructed to west of dwelling (b) Oversize half dormer windows to front elevation as constructed. (c) Roof over front porch as constructed. (d) Domestic garage as constructed. (e) Existing entrance onto public road and all associated site works / 1.7 km away / 12 April 2021Conditional grant