2560554: Construction of 87 No. residential units (20 No. 1-bed, 12 No. 2-bed, 50 No. 3-bed and 5 No. 4-bed) as houses and duplexes/maisonettes and a crèche (160 sq m). The proposed development will range in height from 2 No. to 3 No. storeys. The proposed development also includes: a sports pitch with club house (70 sq m); internal road network; 175 No. car parking spaces; 2 No. drop-off spaces; cycle parking and stores; bin stores; ESB sub-station; hard and soft landscaping; boundary treatments; public lighting; PV panels; and all associated site and development works above and below ground
Broomhall Rathnew Co. Wicklow, The site is generally bounded: to the north by Kirvin Hill and Waverley Drive residential estates to the east by a water storage reservoir and an existing road with a residential development currently under constructio
DecisionConditional grant
Decided23 January 2026
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2660133Design revision to the permitted creche as per WCC grant Ref 21/1119, to include 2 no. staff accommodation units and to increase the overall capacity of the creche and carpark, including all associated site works / 0.1 km away / 08 June 2026Conditional grant
- 211119Proposal is for Phase 1 of a 2-phase development and will consist of; - A) The construction of 84 no. dwellings ( and 2 storey creche c.301 sqm) comprising 1. no. 3 bedroom bungalow, 8 no. 2 bedroom houses, 61 no. 3 bedroom houses, 7 no. 3 bedroom 'Courtyard' dwellings ( all 2 storey), and 1 no. part 2 storey/3 storey 4 bedroom 'Courtyard' dwelling, 6 no. 1 bedroom apartments in 2 no. 3 storey buildings; B) All ancillary development works include footpaths, landscaping boundary treatments, public, private and communal open space areas (including balcony or terrace), car parking (170 no. spaces) and bicycle parking, single storey ESB substations, regrading/re-profiling of site where required and all ancillary site development /construction works ( including diversion of existing services and all new site services connections ); C) Vehicular access from the existing Broomhall roundabout, via upgraded vehicular access route along the western side of development with pedestrian access to eastern boundary and to the north; the proposed development will allow for all roads, services and landscaping for Phase 1 and Phase 2 sites / 0.2 km away / 02 February 2022Conditional grant
- 19133Attic conversion to bedroom and storage space, two no rear attic velux windows all internal works / 0.2 km away / 27 March 2019Conditional grant
- 19410Conversion of attic space to habitable accommodation, along with one no rooflight window to front and one no rooflight window to rear of dwelling together with all associated site works and services / 0.2 km away / 30 May 2019Conditional grant
- 211187Phase 2 of a 2-phase development and will consist of: (A) The construction of 66 no. dwellings comprising 1 no. 3 bedroom bungalow, 18 no. 2 bedroom 2 storey houses, 44 no. 3 bedroom 2 storey houses, 3 no. 1 bedroom apartments in 1 no. 3 storey building; (B) All ancillary development works including footpaths, landscaping boundary treatments, public, private and communal open space areas (including balcony or terrace), car parking (112 no spaces) and bicycle parking, single storey ESB substations, regrading/re-profiling of site where required and all ancillary site development/construction works (including diversion of existing services and all new site services connections); (C) Vehicular access from the existing Broomhall roundabout, via upgraded vehicular access route along the western side of development with pedestrian access to eastern boundary and to the north; the proposed development will allow for all roads, services and landscaping for Phase 1 and Phase 2 sites; / 0.2 km away / 02 February 2022Conditional grant
- 1850Housing development consisting of 92 dwellings with connection to mains services and associated works including attenuation, roads, footpaths, boundaries and boundary treatments, public lighting, mini pillars, open spaces and landscaping / 0.3 km away / 22 May 2018Conditional grant
- 2573An attic conversion with dormer window to the rear, 1no roof light to the front of the existing house, relocation of existing solar panels and internal modifications for a new stairs access / 0.3 km away / 22 May 2025Conditional grant
- 2460631Closure/ removal of existing access into Broomhall Lodge site. Construction of 6 No. 2 storey, 2 bedroom terrace residential units. Construction of 4 No. 1 bedroom maisonette apartments. Provision of car parking and public amenity space to serve the development. New vehicular access via Hawks Bay development, Pl. Ref. 21/1119 and 21/1187 currently under construction. All together with associated site works, boundary treatments and services connections necessary to complete this development / 0.3 km away / 28 February 2025Conditional grant