Continuation of use of quarrying activity including extraction and processing of rock by drilling, blasting, crushing, screening and washing over a 35 hectare area; Erection of a fixed crushing, screening and washing plant; Landscaping of the quarry during the operational phase and restoration of the quarry on completion of the extraction; All associated ancillary facilities/works; The applicant is seeking a 25 year permission as part of the application. The application is accompanied by and Environmental Impact Assessment Report (EIAR)
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Balleese Wood, Rathdrum ED, The Municipal District of Arklow, County Wicklow, Leinster, Éire / Ireland
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 329 nearby planning records within 5 km where a location match is available.
- Matched source
- 18972
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Construction of a livestock underpass with effluent holding tank and all associated siteworks
The removal of existing septic tank, installation of new wastewater unit, polishing filter to current standards and associate works
The demolition of existing shed and construction of a two-storey extension to the side of the existing cottage and to upgrade the effluent treatment system to current EPA standards and all ancillary site works
Works to existing two storey dwelling (original floor area 70.25sqm) comprising (a) demolition of existing extension (18.25sqm) to rear/side, (b) construction of new two storey extension (120.1sqm) to rear incorporating balcony to rear/side, (c) projecting canopy roof at existing hall door, (d) widening vehicular access gateway, (e) new WWTS to replace existing septic tank, (f) all ancillary site works. Protected Structure - whilst Avon Cottage itself is not a protected structure, the King George post box at the roadside boundary wall is listed - ref.30-02. The post box is unaffected by the proposed works
Enhanced visitor facilities on a site area of c 19.7 ha within a total landholding of c 200 ha. The proposed development will comprise 1. a subterranean orientation space or c 324 sqm, including toilets and an orientation tower 21m in height, 2. a walking trail totalling 218m comprising sunken pathways, tunnels and elevated timber lattice walkways for 460m in length and to a maximum height of 24m, through the tree canopy 3. a timber lattice constructed lookout over the Avonmore River valley to a maximum of 35m in height with associated access stairs and elevator 4. Ground, first floor and mezzanine extensions to the existing venue facility 5. The refurbishment, extension and change of use of the existing outbuildings to a new café and associated kitchen and toilet facilities and associated electricity substation and switch room 6. Upgrade of existing vehicular / pedestrian access points 7. a new vehicular egress point and associated internal road to the public road to the west, 8. Upgrading the existing car park, the provision of a new overflow car park of 250 no car park spaces, 50 no cycle parking spaces and 5 no bus / coach drop off and waiting area together with staff car parking area 9. Demolition of accommodation block utilised for the training and education of staff, a flat roofed shed and a number of lean to structures associated with the outbuildings 10. Internal refurbishment works (partial electrical upgrade and localised repair of roof) to Avondale House (a protected structure) 11. Upgrading pathways and trails 12. Site development works associated with the connection to the existing Wastewater Treatment Plant in Rathdrum, and 12 all other associated works above and below ground
Source match
Matched from public planning record 18972The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report