Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Ballymoney, Kilbride ED, The Municipal District of Arklow, County Wicklow, Leinster, Éire / Ireland

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

14% of nearby decided applications were refused. The preview found 540 nearby planning records within 5 km where a location match is available.

Matched source
2560313
Project type
One-off house
Coverage
5 km radius
540Nearby applications
14%Refused
466Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

2560313

Amend the design of the approved development (Planning Reference: 19/627 and ABP-305289-19) which comprises consent for a Solar Farm within a site area of 19 hectares consisting of solar photovoltaic panels covering an area of up to 9.8ha on ground mounted steel frames, 1 no. on-site substation; 3 no. inverter/transformer stations, underground cables and ducts, boundary security fence, new internal tracks, CCTV cameras and all associated site services within the townland of Ballymoney, near Arklow, Co. Wicklow. Planning permission was sought for a period of 10 years. Proposed amendments include (1) relocation of part of the internal access track, and (2) a gate will be added along the access track

Granted0.0 km12 June 2025
19627

Solar farm within a site area of approx. 19 ha consisting of solar photovoltaic panels covering an area of up to 9.8 ha on ground mounted steel frames, 1 no on site substation, 3 no inverter / transformer stations, underground cables and ducts, boundary security fence, new internal tracks, CCTV cameras and all associated site services. Permission is sought for a period of 10 years

Granted0.2 km01 August 2019
21500

Side extension, which includes 2 bedrooms, wc utility and larger kitchen to existing dwelling, new roof to existing rear section of existing dwelling, removal of existing septic tank, new wastewater system and polishing filter and associated works

Granted0.3 km23 June 2021
2460393

A 10 year permission for the construction of an energy storage facility within a total site area of 0.48 hA to include containerised battery storage modules on concrete support structures, electrical transformer / inverter stations, associated electrical ducting / cabling, security fencing and CCTV security monitoring system, lightning protection poles and ancillary equipment

Granted0.4 km24 April 2025
SI202201

A 10 year permission for the construction of an electrical substation and associated 110kV and MV ancillary infrastructure required to connect ground mounted soclar PV generation to the electricity transmission system; energy storage modules; lightning protection masts; Perimeter security fencing; Access tracks; undergorund cabling; temporary construction compound; tree plating; drainage infrastructure and all associated ancillary site development works

Granted0.5 km10 October 2023
2560361

Period of 10 years for a proposed solar farm and BESS (battery energy storage system) development which will consist of the construction of PV panels mounted on metal frames, inverters, battery storage infrastructure (BESS units, and MV Stations), new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, a temporary construction compound, a substation and all ancillary grid infrastructure and associated works. It is proposed to use the consented Ballymoney Solar Farm access point (Pl Ref: 19/627 and ABP Ref: 305289-19). The solar farm and BESS would be operational for 40 years. A Natura Impact Statement (NIS) will be submitted with this application

Refused0.6 km08 July 2025

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required