Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Ballyryan, Nurney ED, The Municipal District of Muinebeag, County Carlow, Leinster, Éire / Ireland

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The preview found 197 nearby planning records within 5 km where a location match is available.

Matched source
2460005
Project type
One-off house
Coverage
5 km radius
197Nearby applications
12%Refused
172Conditional grants
23Refusal reasons

Top refusal reasons nearby

Other4
Visual Amenity4
Traffic Sightlines3
Residential Amenity2
Rural Housing Need2

Nearest similar decisions

2460005

To construct a single storey dwelling, single storey garage, new domestic entrance from an existing agricultural laneway, septic tank & percolation area, bored well and all associated site works

Refused0.0 km19 September 2024
1817

Permission is sought for construction of a new dwelling with; packaged wastewater treatment system and polishing filter; bored well; splayed entrance and all associated site works.

Conditional grant0.4 km22 August 2018
21279

Permission to demolish an existing house ruins and construct a single storey dwelling, appropriate waste water treatment system, proposed bored well, new entrance, conversion / change of use of existing agricultural outhouse to a domestic storage shed and all ancillary site works and landscaping

Conditional grant0.4 km08 September 2021
2460043

A 10 Year Planning Permission for a solar farm with a total area of circa 192 hectares. The solar farm will consist of solar panels on ground mounted frames, 30 no. single storey electrical inverter/transformer stations, 4 no. single storey spare parts containers, 4 no. Ring Main Units, 8 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 2 no. stream deck crossings and 1 no. horizontal directional drill, temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 4 no. entrances from the L3051, L3052 and L3050. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application

Refused1.0 km25 March 2025
2360093

Permission for an extension to existing dwelling house, along with a pergola and ancillary services

Conditional grant1.2 km13 July 2023
20155

The construction of a single storey dwelling house, formation of a new vehicular entrance and driveway, bored well, wastewater treatment system and polishing filter and all associated site works. A Natura Impact statement has been prepared in respect of the planning application.

Refused1.4 km17 July 2020

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required