To retain the following: (A) Previously approved dwelling house and garage as built on site, (B) Building comprising stable & gymnasium, (C) Building comprising utility boiler house, garden shed & fuel sore, (D) Ancillary structures comprising green house, pigeon coops and associated works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Clowney, Ardue ED, Cavan-Belturbet Municipal District, County Cavan, Ulster, Éire / Ireland
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 209 nearby planning records within 5 km where a location match is available.
- Matched source
- 20233
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
To construct detached domestic garage to rear of existing dwelling and associated site works
Demolition of existing boundary wall and installation of new fencing to rear and side site boundaries and erection of ball stop netting to rear boundary and all ancillary site works
Construct dormer dwelling, effluent treatment system, associated site works, access via existing entrance and roadway
RETENTION of dwelling as constructed with changes to floor plans, elevations, distances to site boundaries to the dwelling previously granted 00/499 (site no. 3 of 4 no. houses)
To retain dwelling as constructed with changes to floor plans, elevations, distances to site boundaries to the dwelling previously granted 00/499 (site No. 4 of 4 No. houses)
Source match
Matched from public planning record 20233The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report