For works to upgrade the Ballyjamesduff Wastewater Treatment Plant off Market Street, in the townland of Derrylurgan, Ballyjamesduff, Co. Cavan. The proposed development comprises demolition of existing above ground tanks and kiosks and below ground structures within the existing WwTP site, and construction of new buildings, new plant, and ancillary and associated development within an extended wastewater treatment plant site located off an existing access lane from Market Street, in the townland of Derrylurgan, Ballyjamesduff, Co. Cavan. The development will consist of 1) demolition and replacement of existing inlet works; 2) provision of a control storm water overflow chamber, and making redundant the existing storm water overflow outfall; 3) repurposing the existing oxidation tank to provide extra storm water storage, with minor demolition works of ancillary structures; 4) provision of tertiary treatment system (tanks and filter); 5) provision of 5 no. buildings for operating equipment; 6) replacement of existing effluent discharge outfall with larger diameter pipe to serve the final treated effluent discharge and any storm water overflow; 7) provision of wash water recycle system to clean equipment; 8) provision of outfall pump station; 9) demolition of existing sludge tank and replacement with sludge thickening unit and sludge holding tank; 10) provision of biological treatment tank; 11) provision of below ground pump chambers and process drainage sumps; 12) provision of odour control unit and above ground duct work; 13) provision of a back-up generator with bunded diesel tank; 14) provision of an ESB substation; 15) extension of internal access road and provision of turning head and car parking to the western end of the site; and 16) ancillary and associated development including removal of existing trees and vegetation on the site, extension of fence line to new site boundary, and mechanical and electrical service connections. A Natura Impact Statement will be submitted to the planning authority with the application. Significant further information and revised plans have been submitted.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Ballyjamesduff Wastewater Treatment Plant , Derrylurgan Ballyjamesduff , Co. Cavan
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
6% of nearby decided applications were refused. The preview found 243 nearby planning records within 5 km where a location match is available.
- Matched source
- 22145
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Retain and complete domestic storage shed at rear
To erect an 18m high monopole telecommunications support structure together with antennas, dishes and ancillary works all enclosed in security fencing
For the construction of telecommunications infrastructure comprised of; an 18m monopole (overall height of 19.5m), antennas, dishes and associated equipment, together with new ground level equipment cabinets, fencing, landscaping, the removal of 2 no. existing wooden support poles and all associated sites works
For development consisting of proposed new site entrance and associated gate and all ancillary site development works
For change of use from existing Bar and Lounge (formally known as Sodens) with apartment over to 2 No. two storey townhouses within existing building footprint, demolition of part of existing building to the rear, construction of new rear wall (single storey), internal reconfiguration, adjustments to front elevation including new glazing and render finish with minor alteration of existing connections to town foul & storm sewer and water for both dwellings and all ancillary site works required
Source match
Matched from public planning record 22145The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report