To deposit excavated material from the proposed development, the subject of planning permission PL 16/485 at Ballytherm Ltd. on their site at Rakeelan, Ballyconnell, Co. Cavan as a prerequisite of further development. Significant further information and revised plans have been submitted
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Rakeelan, Ballyconnell ED, Cavan-Belturbet Municipal District, County Cavan, Ulster, Éire / Ireland
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
3% of nearby decided applications were refused. The preview found 151 nearby planning records within 5 km where a location match is available.
- Matched source
- 18442
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For the erection of extensions to the left & right sides of the existing building comprising of store, loading area, workshop, offices & staff area. Works to also include alterations to elevations and internal layout & associated site works
To construct a fully serviced single storey extension to rear of existing dwelling together with attached domestic garage incorporating photovoltaic solar panels to roof and to construct entrance piers and fence to rear of existing footpath and all associated works
- RED III - for a solar energy development comprising ground mounted solar photovoltaic (PV) panels, mounted on steel support structures, underground cabling, temporary construction compound, erection of Transformer station (11kV), laying of a permeable gravel access track, widening of existing site (field) entrance, relocation of the existing ESB overhead line, erection of CCTV poles and cameras, erection of an entrance gate, artificial berm, landscaping and biodiversity measures all associated ancillary development works, for the purpose of generation renewable energy electricity. Planning Permission is sought for 35-year operation of the solar farm following which the site will be decommissioned, all development removed and the Site restored to agricultural lands
To demolish 2no. existing mill buildings and ancillary site works.
For development consisting of alterations, extension and change of use to Slieve Rushen House to form a Heritage and Ecological Visitor Centre, including toilet facilities, café, information display etc and meeting rooms and 1 no. self catering apartment with associated improvements and upgrade to the existing vehicular access and provision of new car-parking, picnic area and play-park and connection to the public sewer
Source match
Matched from public planning record 18442The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report