Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Stump of the Castle, Rathdrum ED, The Municipal District of Arklow, County Wicklow, Leinster, Éire / Ireland

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The preview found 307 nearby planning records within 5 km where a location match is available.

Matched source
19823
Project type
One-off house
Coverage
5 km radius
307Nearby applications
12%Refused
269Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

19823

Vehicular entrance, driveway and associated site works

Granted0.0 km09 September 2019
19862

Single storey side & rear extension together with RETENTION for existing side and rear single storey extension, some minor elevational alterations and all ancillary site works together with retention of effluent treatment system and percolation area to current EPA standards

Granted0.0 km23 September 2019
20641

Dwelling, effluent treatment system in accordance with EPA 2009, and associated site works

Granted0.6 km14 December 2020
191359

Suspension footbridge over the Avonmore River

Granted0.7 km12 February 2020
211047

The development will consist of: (1) a semi-indoor structure for safe archery; (2) 2 No. skytrail climbing frames to heights of 14.65m and 2.5m; (3) a raised resort events stage and 9.6m wide by 4.8m high silent big flat screen tv behind connecting only to visitors Bluetooth headphones; (4) all associated site works. These developments to be served by existing parking/access arrangements granted under planning permission 16939 as amended by 17856 & 181083

Granted0.8 km15 November 2021
23436

Proposed development comprising of retention of alterations to and alterations to development granted permission under Reg Ref 211047 and for new development as follows: (1) Retention of 'asbuilt' modifications to the previously granted raised resort stage and silent big flat screen tv (connecting only to visitor Bluetooth headphones) to include 13.15m wide X 8.2m tall supporting concrete structure and completion of works; (2) viewing area for resort events stage (as previously granted); (3) part retention of and completion of an indoor children's climbing/play building with a footprint area of 101.25 sqm to rear of the big screen's supporting concrete structure; (4) 44.45 sq.m extensions & internal subdivision to previously granted semi-indoor structure for safe archery & permission for use for other recreational activities; (5) A "splashpad" outdoor water play area in lieu of 2 No. skytrail climbing frames and 291.5 sq.m associated changing shelter structure containing toilets, showers, cleaner room with retained mounded earth bank to the river & a green roof & associated piped services; (6) climbing tree structure (18.45m tall): (7) a zipline facility operating from the top platform of the climbing tree structure to the top of the changing shelter structure & all associated structural development: (8) tiki shelter structures and associated outdoor picnic style areas to be located beside the archery/activity building (total floor area under tiki shelters of 36 sq.m); & (9) landscaping including mounding to river, paving & soft planting. All associated site works; these developments to be served by existing parking/access arrangements granted under Wicklow Co.Co. permission, Reg. Ref. 16939, as amended by permissions Reg. Refs. 17856, 181083.

Granted0.8 km12 December 2023

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required