Erection of a new cubicle shed, underground slatted slurry tank, overground slurry tower, manure pit, silage pit extension incorporating new wall and floor, new walled silage pit, roof over topless cubicles, roof over existing slatted animal feeding and exercise yard, concrete yards and ancillary works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Toberbeg, Dunlavin ED, The Municipal District of Baltinglass, County Wicklow, Leinster, Éire / Ireland
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 264 nearby planning records within 5 km where a location match is available.
- Matched source
- 221400
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Erection of a new entrance access road to farmyard and ancillary works
Demolition of existing single storey dwelling and adjacent garage, proposed single storey replacement dwelling and flat roof domestic garage, relocation of domestic garden store, proposed treatment system and percolation area, and all associated site works
Construct a new dwelling house, domestic garage, on site sewerage treatment system, alteration to existing entrance and all ancillary site works
A dwelling, effluent treatment system and entrance
As-constructed dwelling house, effluent treatment system, bored well, stable shed, entrance, revised site boundary as previously granted by PRR 21/92 and all ancillary site works
Source match
Matched from public planning record 221400The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report