Planning records
Showing 1-6 of 6 public recordsConstruct extension to side of dwelling house to comprise 2 no. bedrooms, bathroom, living room and extend domestic garage.
The demolition of all existing structures within the Tinryland Wastewater Treatment Plant and the construction on an extended site (0.09 ha in total) which will consist of a new pumping station (17m2), new below-ground storm tank (total storage of 123m³), replacement welfare facility (33m2), ground-mounted photovoltaic array (83 m2), new palisade perimeter fencing (2.4m high) and associated works; the construction of a new rising main and gravity main (3.7km in length) along the Nurney Road, L1023 and N80, connecting to the existing wastewater sewer at Ballinacarrig; and all ancillary and associated temporary works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
The proposed alterations to existing dwelling, erection of ground floor and first floor extensions and all associated site works
Planning permission for a ten year planning permission for the proposed erection of 94 No. fully serviced dwelling houses, 1 No. creche and all associated site works (planning previously granted under PL. Reg. No. 04/856 & 07/93 on approx. site)
Retention Permission for a two storey rear extension to an existing dwelling house. The development consists of a ground floor sun room extension and a first floor extension of an existing bedroom including external balcony.
Construction of a rock ramp fish pass in front of the existing Ballinacarrig Weir. The fish pass will require the lowering of a section of the weir. A Natura Impact Statement (NIS) will be submitted with this Planning Application.