Planning records
Showing 1-4 of 4 public recordsConstruction of a new dwelling, wastewater treatment unit and polishing filter, new well, upgrading existing entrance onto existing lane which leads to the public road and associate works
RED III Category 3 Development - Construction of a solar PV energy development with an operational life of 40 years on three land parcels totalling approximately 203.5 hectares comprising the installation of approximately 806,630 sq. m. of photovoltaic panels on ground mounted frames and associated ancillary development including: 23 no. transformers stations, 2 no. Ring Main Unit buildings, string-inverters attached to panel frames, CCTV security cameras mounted on 4 metre high poles, deer-proof perimeter security fencing (2 metres high) raised 150mm to allow for the movement of small mammals, 3 no. site entrances utilising existing entrances including upgrade to entrance on L1111 to facilitate construction and operational phase access, internal access tracks between the solar arrays and the site entrances, 2 no. clear span bridges over existing watercourses, 1 no. primary temporary construction compound and 2 no. satellite temporary construction compounds, all associated ancillary development works including landscaping; and the installation of a total of ca. 6.1 kilometres of 33Kv double circuit underground cable, of which ca. 2.4 kilometres will be beneath public (L1111, L1113, L5113, L51132 and L5112) and private roads in an excavated trench including underground ducting and joint bays and all associated site development and reinstatement works to connect the proposed Ring Main Units on two of the land parcels of the solar PV energy development and extending to the site of a proposed 110kv substation to be the subject of a separate planning permission under the Planning and Development (Strategic Infrastructure) Act 2006.
The reclamation of land through the filling of material compromising clay, silt, sand, gravel or stone on a site having an area of 8.20 hectares, for the purpose of improvement of land, together with the retention and use of the existing site access road, entrance off the old N11 and wheel wash, all constructed by reference to PRR17/978 and new roadway and other ancillary site works
Section 254 - roadside directional - location 1 map WH1