Planning records
Showing 1-6 of 6 public recordsThe proposed development will consist of alterations to the Kilfenora wastewater treatment plant and percolation area development approved by An Bord Pleanála under reference ABP-305756-19, and consists of: 1. Modifications to site access and internal roads at the wastewater treatment plant to include (a) raising of access road level from the public road (L1034) to the site entrance gates, to include provision of permeable paving finish, and (b) widening/reconfiguration of internal road in focused areas, permeable paving finish, hard surface area and gully, and provision of petrol interceptor; 2. Modifications to site access and internal road at the percolation area to include new roadside channel drain and provision of permeable paving finish; 3. All ancillary site development and excavation works above and below ground necessary to facilitate the development. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application
For the proposed development which will service and consist of alterations to the Kilfenora wastewater treatment plant and percolation area development approved by An Bord Pleanála under reference ABP-305756-19, and consists of: 1. Disconnection and capping of existing gravity effluent pipe (pipework to be retained in situ); 2. The installation of a new gravity effluent pipe and connection to pumping station; and, 3. All ancillary site development and excavation works above and below ground necessary to facilitate the development. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application
To RETAIN an extension to the existing single storey dwelling
To build a new dwelling house, install a wastewater treatment system & all other site and ancillary works
Of the changes to the dwelling which was previously granted permission under Refence P18/869 & all other associated works
To construct a dwelling, garage, on-site wastewater treatment system, a new entrance and ancillary ground works