Planning records
Showing 1-50 of 3,240 public recordsTwo storey dormer extension to the rear of the existing house
Block walls and timber fences constructed along roadside boundary
(a) 19 No. dwellings comprising 10 no. (113 sq.m.) 3 bedroom dormer bunglaows, 07 no. (138 sq.m.) 4 bedroom dormer bungalows and 02 no. (102 sq.m.) 3 bedroom dormer bungalows.(b) New pedestrian links. (c) New vehicular entrance off R752. (d) Connection to all public services. (e) All necessary ancillary and site works to facilitate the above
1. change of house type to previously approved planning register ref 18/233. 2. Revised location of vehicular entrance to above dwelling, 3. Proposed new garage of 20sqm, 4. together with all necessary ancillary works to facilitate this development
Plan 8 Architects (www.plan8.ie) are applying, on behalf of our clients Robert & Gosia Freeze, Kerrie & Shane Doyle, Michael & Susan O’Neill, and Ryan Esmonde for Retention Planning Permission for the following: • Retention of Existing front boundary treatments and vehicular entrances. • Retention of Existing side boundary treatments. Planning Permission sought for the following: • Set back roadside boundary of dwelling No. 04. • Provision of new 2m wide roadside setback to allow for the future provision of a public footpath. At Ballyfree East, Glenealy, Co. Wicklow.
(a) change of use from residential to commercial use (coffee shop and ice cream parlour), (b) retention and completion of 14sqm rear extension to house new customer toilets including 1 no. fully accessible W.C., (c) provision of a total of 5 no. velux windows to the side (north and south) elevations and (d) upgrading of the existing effluent disposal system to current EPA standards and all associated site works
The following works - (1). 4 no detached dwellings on individual sites ( which will include 2 separate house types ) (2). The provision of a proposed garage for sites 1, 2 and 4. (3) The provision of an office/shed/studio for site 3. (4) A Proposed secondary treatment system to current EPA guidelines and percolation area to each of the 4 sites.(5). Connection to all services. (6). The Provision of a new vehicular entrance off the public road and internal access road (7). All ancillary works, inclusive of tree-planting, hard/soft landscaping, boundary treatment, provision of solar panels and any drainage infrastructure, necessary to facilitate the development/sites and all associated site works
Dwelling, garage, wastewater treatment system to current EPA standards, bored well and all associated ancillary site works and services
1) existing family dwelling house as constructed; 2) retention of existing septic treatment unit and percolation area as installed; 3) and all relevant associated site works
Installation of an air-to-water heat pump system, including external heat pump unit(s) and enclosure, the installation of an LPG storage tank and enclosure, and all related underground pipework and associated site works
2 no, single storey dwelling houses, house on site 1 is 227sq.metres with a garage of 36.0sq.metres & house on site 2 is 210.0sq. metres with a garage of 36.0sq.metres along with proposed effluent disposal systems to current EPA requirements and associated site works
The construction of an 18 metre monopole support structure (overall height of 19.5 metres) carrying telecommunications antennas, dishes and associated equipment, together with new ground level equipment cabinets, landscaping and all associated site works
Change of use (removal of planning condition no. 2 of planning ref. no. 09/922) from restricted use as a dwelling to use by all classes of persons
Extensions and alterations to an existing 120.15m2 dwelling. The works will include: 1. A proposed new 88.5m2 ground floor extension to the side and rear of existing dwelling to include new entrance and living/ancillary spaces. 2. A 7.3mm new extension to the side of the existing dwelling to accommodate a new stairs. 3 A 2.5m2 extension to upper floor to accommodate new layout and bathroom. 4 Alterations to existing plans and elevations to accommodate new proposals. 5. The removal of existing render on existing building to allow for existing stonework to be exposed. 6. All associated siteworks and landscaping
1. The demolition of 2 No. existing outbuildings/store units (previously used as part of Kerry Foods plant operations) circa 340 sq.m. 2 The erection of a new storage/grain storage facility circa 1164m2. 3 A new garage structure for maintenance and upkeep of Fleet vehicles for Kinsella Transport and Logistics Limited. 4. New security fencing to perimeter as well as parking facilities and all associated site works 5. The proposed works will be accessed and serviced by that previously granted permission under file ref 23/60069
1. 14sqm extension to the rear of the existing garage and 2. planning permission for a new 28sqm standalone office studio to the rear of the main house
Proposed new circa 19.11m2 extension to rear of existing 110sqm dwelling & all associated site works
1. The demolition of 2 No. existing timber sheds (previously used as part of Kerry Foods plant operations). 2 The erection of two new storage unit facilities (each measuring c 409m2), new entrance and access road, new security fencing to perimeter as well as parking facilities and all associated site works
Dwelling as constructed, new entrance on to public road to serve this dwelling, change of use removal of condition 2 of Planning Register Reference 01/4276 and all associated siteworks
For proposed improvements of existing logistics facility. The proposal will include the following (1.) A 383sq.m. extension to existing 287 sq.m. of logistics/distribution buildings on site ( 2). A Proposed new circa 1540sq.m. purpose built logistics/distribution facility with ancillary office space of circa 140 sq. m.attached with associated parking ( 3). The provision of a new truck/trailer storage yard. (4). Proposed new entrance gates /piers (5). The provision of new upgraded vehicular entrance off the public road with associated improved internal access road (6). A Proposed new secondary treatment system to current EPA guidelines and percolation area to service the development (7.) the reinstatement of an existing weigh bridge on site to working order (8) The provision of new security fencing to areas required (9) Demolition of Existing Shed/ building Circa 286 sq.m. and (10) all ancillary works including all drainage infrastructure, and any other works necessary to facilitate the development
For permission for demolition of existing front and rear extensions, construction of new rear and front extensions, internal modifications to existing dwelling, new garage and associate works
Removal of planning condition no. 2 of planning reg. ref. no. 96/5066 (from restricted use as a dwelling to use by all classes of persons) and retention of domestic garage as constructed on site
Change of use (removal of planning condition no. 2 of planning ref. no. 03/9834) from restricted use as a dwelling to use by all classes of persons and retention of domestic garage on site
Change of use (removal of planning condition no. 2 of planning ref. no. 02/6113) from restricted use as a dwelling to use by all classes of persons and retention of domestic garage as constructed on site
Construction of a loose shed for young horses, hard core surround and all associated site works
New dwelling house, new entrance with sight lines, connection to existing sewage and public water supply, all associated works
Demolition of existing shed/log store and construction of new 37m2 storage shed & home office space in rear garden of existing dwelling
Alterations to previously approved Pl.Reg Ref. 17/706 for the following: 1. New clubhouse design. 2. New Effluent treatment system design. 3. New carparking layout. 4. Repositioning of Pitch no. 02 together with all associated ancillary works to facilitate the above at, Ballyfree West, Glenealy, Co. Wicklow.
Garage/home office as constructed on site and all associated site works
For demolition of single-storey extension to side and erection of two-storey extension to rear with new sewage treatment system, relocation of recessed vehicular access and ancillary site works
Demolition of single-storey extension to side and erection of single/two-storey extension to rear with new sewage treatment system, and ancillary site works
Entrance porch and balcony and raising of lower section of dormer roof to match height of main roof and provision of two dormer windows to new ensuite shower rooms within the extended roof space
(1) a two-storey side extension including provision of 2 no. new dormer windows, (2) a single-storey rear extension and (3) a first floor extension over previously approved porch structure (Reg. Ref. 19/1346) to the front of the existing dwelling
Alterations and additions to the previously approved extension works (reg ref 21/227) to the existing dwelling
(1) a two-storey side extension including provision of 2 no. new dormer windows and (2) a new single-storey porch with an additional first floor dormer window over to the front of the existing dwelling
For outline permission for sub division of an existing site for 3 new dwellings, blocking up 2 existing entrances onto public road and constructing 2 new entrances onto public road, Removal of 2 existing septic tanks, installing 5 new wastewater treatment units and soil polishing filters for proposed 3 dwellings and two existing dwellings, demolition of existing greenhouse and associate works
A detached single storey flat roofed masonry - built storage shed to the rear of the property
Construction of a detached, part single, part two-storey, dwelling, providing a floorspace of 405 sq. metres and containing five bedrooms, a combined kitchen / dining / family room and ancillary bathroom, hallway, pantry, utility / boot room, laundry and walk-in wardrobe accommodation, as well as a garage / home gym. The new house would be accessed via an existing agricultural entrance, which is to be modified, which would lead to the house via a gravel driveway and parking area and, as well as a BAF P6 secondary waste-water treatment facility and soil polishing filter to current EPA standards, a new private well, and all site works including soakaways (to BRE Digest 365 specification) and landscaping
Alterations to an existing dwelling comprising a) new roof, b) minor changes to elevations including new external doors / windows and removal of chimneys, c) new boundary walls to front, d) relocation of wastewater treatment unit and e) all associated site works
Development of an equestrian centre at Ballymoat, Glenealy. The development will generally comprise 3 stable blocks, outdoor arena; indoor arena with viewing area; sheds / buildings for storage of hay, straw, dung, machinery, lorries; a lunge pen; breeding barn and operators’ residence together with associated site development works /services; effluent treatment / disposal; and other infrastructure / welfare provisions for the project
Stud farm and private dressage stables which will generally comprise of the following: • a new entrance and access road; • 2 No. stable blocks incorporating stores, tack rooms and toilets; • breeding barn; • outdoor and indoor arenas; • canteen and staff facilities; • a lunge / walker pen; • sheds / buildings for hay, dung storage and waste management; • a lorry shed; • on site effluent treatment / disposal system; • storm water management; • associated site development works, car parking and services and other infrastructure / welfare provisions for the project; This planning submission includes a Natura Impact Statement
A new sewage treatment system to EPA standards and all associated ancillary site works and connection to services
; 1. The demolition of existing 683m2 of industrial units and covered areas. 2. The construction of new modern replacement industrial units to cater for current requirements which are (a) A proposed new 604m2 industrial unit (1) which will include circa 167m2 of ancillary usage to accommodate a reception area / office/ staff facilities and storage area. (b). A proposed new 339m2 Industrial Unit (2) and ancillary rooms (c). An external covered area for storage purposes circa 156 sq.m. 3.The decommissioning of an existing septic tank and the installation of a new secondary treatment system and soil polishing filter to EPA 2021. 4. New Security fencing to boundaries where required 5.New customer parking area. 6. A New display area for display sheds and garden rooms and all associated landscaping and site works
Proposed dwelling, waste water treatment system to EPA standards, entrance, driveway and associated works
Demolition of existing extension to rear of existing dwelling, construction of new rear extension and associate works
New domestic garage and associate works
The removal of condition 5(c) of the previous planning permission (Ref No 22/628) made by Wicklow County Council, that within seven years of the date of the decision, unless otherwise authorized by a separate grant of permission, the use of this building as an 'independent' living unit shall cease. Thereafter, this building shall be used as a garage, store, play room, gym, games room, hobby room or comparable use ancillary to the main dwelling and shall not contain an room that is laid out as or in use as a bedroom. Retention of existing independent living unit as constructed
(1) An Integrated Extension to existing family farm house for an independent single storey mews, comprising of 1 bedroom ensuite, toilet, kitchen/living and dining area. (2) Upgrade existing septic tank/soak pit with a Sewage treatment unit and percolation area to EPA guidelines. (3) Connection to existing public water mains. (4) Access to mews off existing internal farm road. (5) All associated site works
Proposed dwelling, waste water treatment system to EPA standards, garage, with entrance through existing entrance to public road, and associated works
RED III Category 3 Development - Construction of a solar PV energy development with an operational life of 40 years on three land parcels totalling approximately 203.5 hectares comprising the installation of approximately 806,630 sq. m. of photovoltaic panels on ground mounted frames and associated ancillary development including: 23 no. transformers stations, 2 no. Ring Main Unit buildings, string-inverters attached to panel frames, CCTV security cameras mounted on 4 metre high poles, deer-proof perimeter security fencing (2 metres high) raised 150mm to allow for the movement of small mammals, 3 no. site entrances utilising existing entrances including upgrade to entrance on L1111 to facilitate construction and operational phase access, internal access tracks between the solar arrays and the site entrances, 2 no. clear span bridges over existing watercourses, 1 no. primary temporary construction compound and 2 no. satellite temporary construction compounds, all associated ancillary development works including landscaping; and the installation of a total of ca. 6.1 kilometres of 33Kv double circuit underground cable, of which ca. 2.4 kilometres will be beneath public (L1111, L1113, L5113, L51132 and L5112) and private roads in an excavated trench including underground ducting and joint bays and all associated site development and reinstatement works to connect the proposed Ring Main Units on two of the land parcels of the solar PV energy development and extending to the site of a proposed 110kv substation to be the subject of a separate planning permission under the Planning and Development (Strategic Infrastructure) Act 2006.