Planning records
Showing 1-2 of 2 public recordsAlterations to development previously approved under Reg. Ref. 21/1296 comprising: (a) minor repositioning of the indoor arenas; (b) minor repositioning of and reduction in the floor area of the single- storey horticultural training, learning & educational building with classroom, workshop, W.C./changing rooms and kitchen (from 643sq.m to 438sq.m); (c) minor repositioning of and reduction in the floor area of the part-single part two-storey therapeutic/support building and training, learning & educational facility with classrooms, quiet rooms, W.C./changing rooms, canteen, administration/office space, farm shop, kitchen and plant store (from 980sq.m to 894sq.m); (d) minor repositioning of the covered stable building (no change to building floor area) and relocation of the manure bay; (e) minor reconfiguration of car parking area (with no change to number of car parking spaces (86 no); (f) omission of the percolation area; (g) provision of new single-storey stable building to the immediate north of the approved covered stable building; (h) removal of lunge arena to the immediate east of the outdoor arena and provision of new multi-purpose arena and new covered seating area to the immediate north of the outdoor arena; (i) provision of integrated constructed wetlands within the north-west corner of the site; and, (j) all associated site development and infrastructural works, inclusive of tree planting, hedgerow planting, landscaping, boundary treatments, lighting, signage, pedestrian/horse paths and SuDS drainage infrastructure, necessary to facilitate the development. No works are proposed to Belfield House under this application. Belfield House is a Protected Structure. This application is lodged by Festina Lente Enterprises, a registered charity (Charity No. 16821)
(a)removal of existing vehicular entrance serving Belfield Hse via the N11 & provision of replacement vehicular entrance & assoc access driveway, to serve Belfield Hse via Ballyronan Rd; (b)construction of an equestrian, horticultural & community-based training, learning & educational facility, to be served by vehicular/pedestrian entrance/exit points via Ballyronan Rd & comprising of: (i)2 no. indoor horse-riding arenas (combined 80m length x 30m width) with assoc viewing galleries & adjoining part-single/part 2-storey building containing conference room with external terrace, admin/office space, classrooms, equipment rooms, W.C./changing rooms & mechanical horse circuit; (ii)single-storey horticultural training, learning & educational building with classroom, workshop, W.C./changing rooms & kitchen; (iii)single-storey therapeutic/support building with classrooms, quiet rooms, W.C./changing rooms, administration /office space & plant store; (iv)single-storey training, learning & educational canteen facility with assoc W.C./changing rooms, kitchen, plant store & external dining terrace; (v)part-single part 2-storey admin/farm shop building comprising board room, admin/office space, reception & internal/external farm sales areas with associated store room; (vi)stable yard with horse–walker, horse-box parking area, ancillary equine/site management sheds & single-storey stable facility accommodating 36 no. individual horse stalls with 18 no. adjoining outdoor stalls & assoc equipment/feed/service/staff rooms; (vii) single-storey garden workshop building containing workshop, storeroom, W.C./changing rooms, chemical store & plant store; (viii)2 no. polytunnels (each of 6m width & 18m length) & allotment garden (approx 2,300sq.m) providing individual planting plots/spaces; (ix)outdoor horse-riding arena (80m length x 30m width) with assoc water training area & lunge arena; &; (x)vehicular parking area comprising 87 no. car parking spaces (inclusive of 6 no. accessible & 8 no. electric vehicle charging spaces), 20 no. bicycle parking spaces & assoc drop-off/bus parking area; & (c)all associated site development & infrastructural works, inclusive of tree removal/planting, hedgerow removal/planting, landscaping, boundary treatments, lighting, signage, internal access/service roadways, pedestrian/horse paths, ESB substation & SuDS drainage infrastructure, necessary to facilitate the development. No works are proposed to Belfield se under