Planning records
Showing 1-50 of 1,125 public recordsTo construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
To construct a new dwelling house, site entrance and on-site wastewater treatment system along with all other associated site works and services
To construct a Columbarium Wall on the grounds of the existing graveyard with associated ancillary siteworks
For the development which will consist of renovating and extending existing dwelling house c/w ancillary site works
For development which will consist of a loose cattle shed
Of extensions and revised elevations to dwelling house
To modify, convert and extend 2 no existing agricultural buildings to residential accommodation, install a proprietary wastewater treatment plant with percolation area and associated ancillary site works
To erect 5 No dwellings & foul sewer treatment systems & percolation areas, to connect to ancillary services and to develop service road and new site entrance
To demolish an existing farm shed and planning PERMISSION to construct a slatted house along with all associated works
To RETAIN a previously constructed extension to the existing dwelling house and PLANNING PERMISSION for an extension to the side of the existing dwelling house along with all associated and ancillary works
For development, the development consists of the construction of a hay shed and associated site works
To construct a new dwelling house, new entrance, private garage and install a new wastewater treatment system along with all associated works
Retention of the construction of a mechanic workshop and permission to construct a carpark and handling area ancillary to the workshop along with all associated works
To construct a slatted cubicle house, complete with associated underground slurry tanks, and also including cattle crush and ancillary concrete yard, and all associated site works
To restore, refurbish & extend an existing derelict dwelling and outbuilding, installation of new sewerage treatment system, construct new entrance walls, along with all associated works
To upgrade existing entrance to forest lands and to construct forest access road with all ancillary site works
To renovate and extend the existing dwelling house to include the provision of a new sewage treatment system together with all necessary ancillary services
To construct an extension to an existing dwelling, install a new wastewater treatment system, demolish existing flat roof sheds and all other ancillary site works
Of elevational changes to comprise of 4 No. rooflights, 1 No. window, internal and external modifications to dwelling as built including ancillary site works
For the construction of a sunroom to the side of an existing dwelling, construction of a domestic and alterations to the house granted under P8-14484 along with all associated works
To refurbish, alter and extend an existing dwelling house along with all associated works
For development which will consist of A, Retain ground floor rear extension, first floor conversion, external shed and B, to construct a garage and canopy to rear of house including all associated site works and services
For (a) Alterations to the existing cottage elevations and internal layout; (b) Construction of a new extension to the side and rear of the cottage; (c) All associated site works and services.
To make the following alterations to the existing dwelling house. a) demolish existing front porch and rear kitchen/utility extension; c) construct link extension to connect house to existing outbuildings; d) convert section of existing outbuildings to residential use ancillary to the main dwelling; e) make elevational changes to the existing house and outbuilding; f) upgrade existing sewerage treatment system and g) all associated site works and services
To construct a dwelling house, garage with a waste water treatment system and percolation area
To construct extension to rear of existing dwelling, connection to existing septic tank / percolation area, including ancillary site works
Of the development which consists of: 1) a single storey, masonry constructed extension to the rear of existing dwelling, 2) conversion of attic to storage space with Velux window to roof on front elevation of existing dwelling and 3) a single storey, flat roof outbuilding to the of existing dwelling
For development of a Livestock Slatted unit with calving pen and associated ancillary siteworks
For development of a livestock slatted unit with associated ancillary site works
To RETAIN a private garage and conversion of attic space to habitable accommodation along with all associated works.
To construct a new dwelling house, private garage, site entrance, on-site wastewater treatment system and all associated site works and services
For construction of an easy feed slatted house comprising underground slatted slurry tanks, feed area for cattle, agitation point, calf penning area, central passage, walled in manure pit, and cattle crush on site of old cubicle house to be demolished and all ancillary site works
To build a new dwelling house, a private garage with new on-site sewage treatment system and all necessary ancillary services.
To construct a new dwelling house and private garage with new wastewater treatment system with all necessary ancillary works
To change the design and the location on site of the proposed dwelling house authorised under planning permission P20-440 with all necessary ancillary services
For to construct an entrance and access road to existing forestry lands and associated site works
For the erection of 4 no. wind turbines with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m, the construction of crane hardstand areas and turbine foundations, the creation of a new site entrance onto the L6132, construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of 1 no. permanent meteorological mast of 82m overall height, construction of new internal site access tracks and upgrade of existing site track, to include all associated drainage including new clear span bridge crossing of the Moyasta River, development of a site drainage network, biodiversity enhancement measures, construction of 1 no. permanent 38kV electrical substation, 2 no. permanent spoil storage areas, all associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation and to the existing Tullabrack 110kV Substation, all ancillary forestry felling to facilitate construction including the development of one no. borrow pit, vertical realignment of an existing crest curve on the L6132. This application is seeking a ten year permission and a 35 year operational life from the date of commissioning of the wind farm. The planning application is accompanied by an Environmental Impact Assessment (EIAR) and a Natura Impact Statement (NIS)
For development, the development consists of a new waste water treatment system with the refurbishment of the exiting access to site and all associated site works
For development which consists of the demolition of existing substandard cottage to allow for the construction of a new replacement house with a new waste water treatment system and the refurbishment of the existing access to site and all associated site works
To Extend the Appropriate Period of Planning Permission for P19/547 for development which consists of the demolition of existing substandard cottage to allow for the construction of a new replacement house with a new waste water treatment system and the refurbishment of the existing access to site and all associated site works
For the Construction of a single storey extension to existing dwelling to include front porch, Living area, Dining area, T.V Room, Play room and for internal and elevational changes to existing dwelling. Also PERMISSION is sought for the demolition of existing conservatory to side of dwelling and demolition of detached garage, including ancillary site works
For the construction of a new dwelling house, the demolition of existing structures, the installation of a wastewater treatment system and all other site and ancillary works
To remove existing sheds and to construct a new dwelling house, site entrance, access road, wastewater treatment system and all associated site works
Of 1. The porch and sunroom extensions onto the existing dwelling, 2. The renovation of the original cottage on site into a self contained one bedroomed unit, for the ancillary enjoyment of the occupants of the main dwelling & all other associated site and ancillary works
The development consists of the RETENTION of a domestic garage together with ancillary site works
For development, the development is located in the townlands of Ballykett, Tullybrack East and Tullybrack, Kilrush, Co Clare. The Development will consist of the erection of 4 no. wind turbines with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m. The development will also consist of the construction of crane hardstand areas and turbine foundations, new site entrance onto the L6132, construction of one no. temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of one no. permanent meteorological mast of 82m overall height, construction of new internal site access tracks and upgrade of existing site track, to include all associated drainage including new clear span bridge crossing of the Moyasta River, development of a site drainage network, biodiversity enhancement measures, construction of one no. permanent electrical substation, ancillary forestry felling to facilitate construction of the Development, all associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation and to the existing Tullabrack 110kV Substation. This application is seeking a ten year permission and a 35 year operational life from the date of commissioning of the wind farm. The Planning Application is accompanied by an Environmental Impact Assessment (EIAR) and a Natura Impact Assessment (NIS)
Of existing extension and alterations to P07/173
To construct dwelling house, entrance, foul sewer treatment plant and percolation area plus all ancillary site works
To construct dwelling house, entrance, foul sewer treatment plant and percolation area plus all ancillary site works
To construct a new dwelling house, private garage, site entrance, on-site wastewater treatment system and all associated site works and services