Planning records
Showing 1-50 of 1,750 public recordsTo extend and renovate existing dwelling, install a waste treatment system and all other site and ancillary works. This permission is in lieu of that which was granted under reference P23/446
To replace the existing derelict dwelling with a new dwelling, build a garage, upgrade the septic tank & all other site and ancillary works
For the construction of a dwelling house, detached garage, boundary wall with recessed entrance, effluent treatment plant and all ancillary site work
For the following development; a) alter, renovate and extend the existing dwelling house; b) provide new on-site wastewater treatment system; c) construct new private garage; and d) all other associated site works and services
To Extend the Appropriated Period of Planning Permission P18/433 to construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works
To regularise the change of the current site boundaries that are at variance with those that were authorised under planning permission P09-1258 with all necessary ancillary services
To construct a boundary wall and vehicular entrance to the front of the property
To build a new dwelling house, garage, install a wastewater treatment system & all other site and ancillary works
Of additions to existing dwelling including garage, utility and 1st floor rooms including all ancillary works
For development of a livestock slatted unit with associated ancillary siteworks
To alter and extend existing dwelling house and construct a new shed along with associated site works
To alter the house plans as granted under P22/30 along with ancillary site works
For a dwelling with on-site wastewater treatment and a new site entrance.
Of the extensions and alterations to the existing dwelling house and for PERMISSION for a new proprietary wastewater system along with associated site works
To vary the design of the dwelling house granted permission under permission P20/968
To construct a dwelling house, domestic garage, wastewater treatment system, re-establish a legacy road access and ancillary works
To construct a new dwelling house, private garage, site entrance and on-site wastewater treatment system along with all other associated site works and services
For development which will consist of the construction of a hay shed, a slatted unit and associated site works
To extend the existing livestock slatted tank and replace the existing building with a new structure with associated ancillary siteworks
For development of a new independent entrance / access road to existing dwelling with associated ancillary site works
To RETAIN minor alterations to the residence and to RETAIN an extension to a garage and use as a light industrial workshop
Of the following a) the alterations and rear extension to the existing dwelling house b) the garage/shed as constructed along with associated site works
To construct dwelling house, garage, treatment system with access to the site via existing avenue and carry out ancillary site works
To construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works
To replace the fire damaged house on site with a new dwelling and upgrade the existing wastewater system and all associated ancillary siteworks
For the construction of a new dwelling house, site entrance, garage, waste water treatment system and all associated site works
The development will consist of the construction of a new dormer dwelling, freestanding shed, sewage treatment system, associated site works and connections to services
For a new entrance, construction of a dwelling with garage, a wastewater treatment system and ancillary works
Of the storage shed on site & all other associated site ancillary works
To 1. Construct a cubicle house for cows with ancillary scrapers. 2. Construct a new milking complex. 3. Demolish old hay shed and old milking complex.
For development to demolish section of existing agricultural building and to construct livestock slatted unit plus a cubicle shed with associated ancillary site works.
To construct (i) Slatted shed with underground effluent tank (ii) underground effluent tank and all associated site works
Of the renovation of an existing cottage and of the construction of a single storey rear extension along with all associated works
To construct a new extension to existing dwelling house and associated site works
To construct a bell mouth entrance onto public road to facilitate access to forestry plantation together with internal access road and turning head and all associated site works
To construct an underground dairy washing/soiled water storage tank for agricultural purposes along with all associated ancillary site works
For the following (a) to construct an extension to the rear of an existing derelict dwelling house (b) to carry out alterations to the existing dwelling and (c) upgrade the existing sewage treatment system, along with ancillary works
To RETAIN a private artist studio which replaced a derelict shed on the same site, associated site works and septic tank, all as constructed
To build a new private dwelling, install a waste treatment system and all associated site and ancillary works
To construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works
To renovate, extend the existing Dwelling, creating a Granny Flat within a section of the existing dwelling, upgrade the existing septic tank & all other associated site and ancillary works
(Ref. No. P20/46) to construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works
To build a dwelling, garage, install a wastewater treatment system, and all other associated site and ancillary works
To build a new dwelling, garage, install a wastewater treatment system and all other associated site and ancillary works
To construct agricultural slatted unit, new farm entrance / access plus all ancillary site works
To construct a new dwelling house, garage, sewage treatment system and construct a new entrance onto public road and associated site works
Of an extension made to the side of their dwelling house, the windows as constructed on the their dwelling house along with the site entrance and front boundary wall & PERMISSION to construct a front porch to their existing dwelling along with ancillary site works
Of A) Revised boundaries plus additional entrance/exit B) revised wastewater treatment system location C) Revised house location all as varied from original planning ref P04/860, plus all ancillary site works
For development of a private domestic garage with associated ancillary site works
For the development of a windfarm in the townlands of Cahermurphy, Knocknahila More South, Carrownagry South, Caheraghacullin and Drummin, together with the development of an underground grid connection cable to the National Grid in the townlands of Cahermurphy, Drummin, Doolough, Glenmore, and Booltiagh. The development will consist of 1. Construction of up to 10 no. wind turbines with a maximum overall blade tip height of up to 170 metres and associated hard strand areas. 2. 1 no. permanent meteorological mast with a maximum height of up to 100 metres. 3. 1 no. 38kV permanent electrical substation which will be constructed at one of two possible locations on site: either Option A in Carrownagry South townland or Option B in Cahermurphy townland. The electrical substation will have 1 no. control building with welfare facilities, all associated electrical plant and equipment, security fencing, all associated underground cabling, waste water holding tank and all ancillary works. 4. All associated under-ground electrical and communications cabling connecting the turbines to the proposed on-site substation. 5. All works associated with the connection of the proposed wind farm to the national electricity grid via an underground cable to the existing Booltiagh 110kV substation. 6. Upgrade of existing tracks, roads and provision of new site access roads and hardstand areas. 7. Junction access road works. 8. 2 no. borrow pits. 9. 1 no. temporary construction compound. 10. Site Drainage. 11. Forestry Felling to facilitate construction and operation of the proposed development; and 12. All associated and ancillary site development works. The application is seeking a ten year planning permission and 30 year operational life from the date of commissioning of the wind farm. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed developemnt