Planning records
Showing 1-2 of 2 public recordsAmendments to part of the design of an approved solar farm development (Clare County Council Planning Reg. Ref. P23/60249). The proposed amendments comprise the erection of eight new pole sets and two new masts and replacement of two existing pole sets with two new masts; Placement of overhead lines (comprising 688m) to enable connection to the national grid; Placement of underground cables (comprising 91m) to enable connection from the overhead lines to the approved substation; Alterations to the design, layout and scale of the approved substation; Removal of solar panels (comprising 668sqm) adjacent to the substation; Removal of underground cable route (comprising 1,457m) and associated works for the cable route from the substation to the national grid at Ardnacrusha; and all other associated works
A solar farm on a site of 70 hectares consisting of the following: 309,008 sq. m. of solar photovoltaic panels on ground mounted steel frames; a 38 kV electrical substation with electrical control building and associated compound with palisade fence; the installation of 21 electrical skids within 7 no. electrical compounds (with acoustic barrier fencing); underground power and communication cables and ducts, including underground cabling along the L3056 public road; new and upgraded internal access tracks (including stream crossings as required); 3 no. upgraded site entrances to the public road (one entrance to L-3054 (Lackyle Heights), and 2 no. entrances to L-30541); boundary fencing (including 607m of acoustic barrier fencing on the eastern boundary); landscaping and biodiversity enhancement measures; and all associated ancillary development, site works and services. The solar farm will be operational for 40 years. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application.