Planning records
Showing 1-6 of 6 public recordsFor: 1) Alterations to the Waste Processing Building, including: 1.1) Repositioning of the southernmost loading door at the front of the building by one bay to the left/southwest. 1.2) Construction of a below floor level outgoing loading ramp for the southernmost loading door measuring 17m (L) x 4.5m (B) x 2.15m (D). 1.3) Construction of a below floor level skip intake pit within the eastern corner of the building measuring 12.8m (L) x 12.5m (B) x 3.8m (D). 2) Extension of the Front Yard southeast by 15m. 3) Repositioning of the Site Entrance 5m south. 4) Repositioning of the Weighbridges and Weighbridge Kiosk east-northeast by up to 43m. Reconfiguration of the Weighbridge Kiosk. 5) Construction of an Entrance Ramp measuring 44.4m (L) x 14.1m (B) x 2.4m (H) from the Site Entrance to the Weighbridges. 6) Construction of a Retaining Wall measuring 44.4m (L) x 0.35m (B) x 2.7m (H) between the Front Yard and Entrance Ramp. 7) Repositioning and reconfiguration of the Administration and Welfare Facility and car parking areas. 8) Construction of a Storage Building measuring 3.0m (L) x 2.9m (B) x 2.5m (H). 9) Repositioning of the Lorry Parking Area from south boundary to the east boundary and increase in parking spaces from 9 No. to 10 No. 10) Repositioning of the Odour Control Unit 25m northeast and reconfiguration of the unit. 11) Installation of a Baler and construction of Shed Over measuring 36.2m (L) x 8.5m (B) x 13.5m (H). 12) Recontouring of an embankment area to the north of Rear Storage Yard to be level with the Rear Storage Yard covering an area of 730m². 13) Construction of a Firewater Storage Tank measuring 3m (radius) x 8.0m (H) and Pump Building measuring 12.2m (L) x 2.4m (B) x 3m (H) located within the recontoured area. 14) Repositioning of approximately 40m of northwest boundary fence by 8m inwards towards the centre of the site. 15) Repositioning of the Substation from within Waste Processing Building to 13m west outside of the building. The Substation measures 11.2m (L) x 4.4m (B) x 3.0m (H). 16) Installation of 2 No. Generators. 17) Repositioning of 2 No. diesel tanks from northeastern boundary of the Waste Processing Building to 10m west of the building. 18) Additional area of landscaping along the western boundary of the site measuring 600m². This application is accompanied by an EIA Screening Report, AA Screening Report, Planning and Environmental Report and Drawings
To erect a fully serviced storage extension to side of existing waste handling unit (waste permit WFP-CN-21-0003-01 relates to this facility) and all ancillary site works
To construct a new part two-storey dwelling & part single story dwelling house with detached domestic garage, form new vehicular site entrance onto existing laneway, installation of approved proprietary wastewater treatment system & percolation area, together with all associated site development works
To construct detached dwelling, detached domestic garage, incorporate wastewater treatment system/percolation area, entrance walls and piers and carry out associated site works
Of development from previously granted planning reference no.s 17/467 & 15/142 to consist of: (1) retention of alterations to office extension (2) retention of ESB substation and associated plant (3) retention of Rainwater harvesting tanks and associated infrastructure (4) retention of alterations to parking areas, landscaping and all associated and ancillary works
To alter location of previously approved attenuation tank (Pl. Ref. 11/326) and all associated works