Planning records
Showing 1-6 of 6 public recordsFor (1) to RETAIN part of land reclamation works consisting of peat topsoil extraction, hardcore gravel, access track and fencing. (2) PERMISSION for removal of part of land reclamation works consisting of hardcore gravel, fencing and container and reinstatement of stockpiled peat topsoil and (3)PERMISSION for the installation of a 30m multi-user lattice support structure carrying telecommunications equipment including antennas, dishes, together with concrete equipment building, cabinets and all associated site development works. The proposed development is in a different location to that proposed under planning reference P22/453 which was refused permission. The development will provide for strategic transmission of wireless data and broadband services
(1) of part of land reclamation works consisting of peat topsoil extraction, hardcore gravel, access track and fencing, (2) PERMISSION for removal of part of land reclamation works consists of hardcore gravel, fencing and container and reinstatement of stockpiled newt topsoil and (3) PERMISSION for the installation of a 30m multi-user lattice support structure carrying telecommunications equipment including antennas, dishes, together with concrete equipment building, cabinets and all associated site development works on land at Reaskcamoge, Woodcock Hill, Co Clare. The proposed development is in a different location to that proposed under planning reference P22-453 which was refused permission. The development will provide for strategic transmission of wireless data and broadband services
Of land reclamation works, infilling and the placing of a fence and hardcore gravel and planning PERMISSION for the installation of 30m multi-user lattice support structure carrying telecommunication equipment including antennas, dishes, together with concrete equipment building, cabinets and all associated site development works. The development will provide for strategic transmission of wireless data and broadband services
The development will consist of the replacement of the existing boundary perimeter chainlink/barbed wire fence and gate, with a new 2.4m high palisade fence with gate, and associated site works
The development will consist of the replacement of the existing boundary perimeter chainlink/barbed wire fence and gate, with a new 2.4m high palisade fence and associated works
The development will consist of the removal of the existing chainlink/barbed wire fence and gates and the erection of a new 2.4m high palisade fence with gates to enclose the existing Radio Receiver Building and adjacent ground, and associated site works