Planning records
Showing 1-8 of 8 public recordsFor a renewable energy development in the townlands of Moanmore Lower, Moanmore South, Tullabrack, Tullabrack East and Gower South, Kilrush, Co Clare. The Development will include the: • erection of 3 no. wind turbines with an overall ground to blade tip height of 150m, with a rotor diameter of 136m and a hub height of 82m and a total generating capacity of 15MW, • construction of turbine hard stand areas and turbine foundations, • construction of new internal site access tracks and upgrade of existing site track, to include all associated site drainage, • construction of 1. no new site entrance along the turbine delivery route with access onto the adjoining local road network (L6132), • construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing, • development of a site drainage network, • construction of 1 no. 38kV electrical substation with all associated electrical plant and equipment, security fencing, lightening protection, security cameras and gates, and all ancillary structures and works, • 1 no. permanent spoil storage area, • all wind farm internal cabling connecting the wind turbines to the electrical substation, • all works associated with the permanent connection of the wind farm to the national electricity grid comprising a 38kV underground cable in permanent cable ducts from the proposed, permanent, on-site substation and to the existing Tullabrack 110kV ESBN Substation, • 2 no. flood compensation areas, • vertical realignment of an existing crest curve on the L6132 local road in order to prevent grounding of abnormal load vehicles during delivery of turbine components, • ancillary forestry felling to facilitate construction and operation of the development, • construction of a blade transfer area off the L6132, • provision of 2 no. biodiversity enhancement areas, • upgrade of an existing site entrance onto the adjoining local road network (L2034) including the demolition of an existing wall and removal of hedgerow at the site entrance to facilitate abnormal load vehicles during delivery of turbine components and reconstruction of same wall and replanting of hedgerow, • Landscaping and all associated ancillary works. This application is seeking a ten year permission and a 40 year operational life from the date of commissioning of the wind farm. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS).
To demolish the existing rear extension and to construct a new extension at the rear of his dwelling house to include the decommissioning of the existing septic tank, to be replaced with a new sewage treatment system with all necessary ancillary services
Of existing domestic garage/shed plus all ancillary site works
For the erection of 4 no. wind turbines with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m, the construction of crane hardstand areas and turbine foundations, the creation of a new site entrance onto the L6132, construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of 1 no. permanent meteorological mast of 82m overall height, construction of new internal site access tracks and upgrade of existing site track, to include all associated drainage including new clear span bridge crossing of the Moyasta River, development of a site drainage network, biodiversity enhancement measures, construction of 1 no. permanent 38kV electrical substation, 2 no. permanent spoil storage areas, all associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation and to the existing Tullabrack 110kV Substation, all ancillary forestry felling to facilitate construction including the development of one no. borrow pit, vertical realignment of an existing crest curve on the L6132. This application is seeking a ten year permission and a 35 year operational life from the date of commissioning of the wind farm. The planning application is accompanied by an Environmental Impact Assessment (EIAR) and a Natura Impact Statement (NIS)
To construct additional farm entrance and access road to existing public road plus all ancillary site works
For development, the development is located in the townlands of Ballykett, Tullybrack East and Tullybrack, Kilrush, Co Clare. The Development will consist of the erection of 4 no. wind turbines with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m. The development will also consist of the construction of crane hardstand areas and turbine foundations, new site entrance onto the L6132, construction of one no. temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of one no. permanent meteorological mast of 82m overall height, construction of new internal site access tracks and upgrade of existing site track, to include all associated drainage including new clear span bridge crossing of the Moyasta River, development of a site drainage network, biodiversity enhancement measures, construction of one no. permanent electrical substation, ancillary forestry felling to facilitate construction of the Development, all associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation and to the existing Tullabrack 110kV Substation. This application is seeking a ten year permission and a 35 year operational life from the date of commissioning of the wind farm. The Planning Application is accompanied by an Environmental Impact Assessment (EIAR) and a Natura Impact Assessment (NIS)
For change of use of existing agricultural structure to proposed Farm Shop, Artisan kitchen/bakery, egg packing with storage facilities/staff room and W.C. etc, with associated elevational changes plus exterior cold store room and link, car parking, proposed upgrade of existing foul sewer system, upgrade of existing access roads plus all ancillary site works
To close up existing entrance, construct new vehicular entrance to existing dwelling house, and PERMISSION to fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, including all ancillary site works