18195: The development will consist of the improvement and upgrading of the existing public landing Jetty by replacing the damaged and deteriorating walkway with a slip resistant decking material and repairing the canal bank along the length of the Jetty to prevent future erosion and undercutting of the bank. A Natura Impact statement has been prepared for the project and submitted with the application.
Public Landing Jetty Below Rathellin Lock, in the townlands of Rathellin and Dunleckney, Co. Carlow
DecisionConditional grant
Decided11 July 2018
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 21119Permission for the construction of a slatted shed and associated site works / 0.4 km away / 02 June 2021Conditional grant
- 18255For replacement dwelling at Dunleckney, Muine Bheag, Co. Carlow, R21 PX53 to include the following: 1) To partially demolish/modify the existing single storey dwelling - to facilitate sightlines (by allowing for reinstatement of roadside wall alignment) & to convert the existing single storey dwelling to domestic garage 2) improvements to existing established vehicular site entrance 3) to construct a new two storey dwelling house 4) provision of a new treatment plant & percolation area 5) new bore hole well 6) all associated site development works. / 0.4 km away / 27 February 2019Conditional grant
- 2460026Development will consist of essential maintenance and repair works to the Barrow Navigation, in accordance with Waterways Ireland’s statutory remit, comprising the following: (i) Bank Revetment & Strengthening Works, (ii) Post-Flood Spot Dredging & Maintenance Dredging, (iii) Back-drain Maintenance, (iv) Small-scale Bank Repair Works, (v) Trackway Surface Upgrade Works, (vi) 10 no. Temporary Construction Compounds, (vii) Temporary mobile welfare units, and, (viii) All works ancillary and incidental to the maintenance and repair works referred to above. A Natura Impact Statement (NIS) has been prepared in respect of the planning application and will be submitted with the planning application / 0.4 km away / 13 February 2025Conditional grant
- 2460027The development will consist of: (1) Partial demolition of existing single story extension to rear. (2) Construction of a story and a half extension to rear elevation north and gable elevation east and west some 110 Sqm. (3) All associated site works / 0.6 km away / 02 April 2024Conditional grant
- 2460384Extensions to existing dwelling house (reg ref cw9405) as constructed comprising retention of 2no. single storey extensions which are located to the west and east of the existing dwelling, consisting of a bedroom and sitting room space, together with full planning permission for the construction of a further single storey extension to the north of the existing bungalow with internal alterations and associated external works including all associated site works. / 0.6 km away / 30 May 2025Conditional grant
- 18301The construction of front porch, extension to side of existing single storey dwelling and domestic garage with all associated site works / 0.7 km away / 30 October 2018Conditional grant
- 21321For a stand-alone studio outbuilding within the grounds of Dunleckney Glebe House ancillary and associated with the residential use of the main building. Dunleckney Glebe House is a protected structure RPS reference CW276 / 0.7 km away / 02 February 2022Conditional grant
- 20460Permission for single storey detached double domestic garage and all associated site works / 0.7 km away / 18 February 2021Conditional grant