2460026: Development will consist of essential maintenance and repair works to the Barrow Navigation, in accordance with Waterways Ireland’s statutory remit, comprising the following: (i) Bank Revetment & Strengthening Works, (ii) Post-Flood Spot Dredging & Maintenance Dredging, (iii) Back-drain Maintenance, (iv) Small-scale Bank Repair Works, (v) Trackway Surface Upgrade Works, (vi) 10 no. Temporary Construction Compounds, (vii) Temporary mobile welfare units, and, (viii) All works ancillary and incidental to the maintenance and repair works referred to above. A Natura Impact Statement (NIS) has been prepared in respect of the planning application and will be submitted with the planning application
Along the Barrow Navigation in the townlands of: Newacre Clogrenan Killeeshal Ballinabrannagh Harristown Bestfield or Dunganstown Strawhall Ballygowan, Rathellin LeighlinbridgeMoneybeg Sliguff Ballyellin and Tomdarragh Ballyteigelea (Idrone East By)
DecisionConditional grant
Decided13 February 2025
Application typePERMISSION
Source documents5
Site
What is on file
0refusal reasons17conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- 1No hydrocarbons from machinery to be disposed to groundwater or surface waters.Wastewater Drainage
- 2No wastewater from temporary mobile welfare units to be disposed to groundwater or surface waters.Wastewater Drainage
- 3No polluted water from temporary construction compounds to be disposed to groundwater or surface waters.Wastewater Drainage
- 4No polluted water from temporary construction compounds to be disposed to the public road network.Wastewater Drainage
- 5No interference with public road/footpath without consulting and agreeing with the Municipal Engineer.Traffic Access
- 6No interference with roads-related drainage without initial consultation and approval by the Municipal Engineer.Traffic Access
- 7No materials to be stored or deposited on the public road during works without prior consent of the Municipal Engineer.Traffic Access
- 8Public roads to be maintained free of muck and debris during construction works at all times.Traffic Access
- 9Any opening in adjacent public road/footpath requires a Road Opening License application per Guidelines for Managing Openings in Public Roads 2017.Traffic Access
- 10Machinery and lorries to be kept free of muck/debris; road sweepers to be used where debris is deposited on public roadways.Traffic Access
- 11CEMP to be submitted to Area Engineer prior to commencement of works.Construction Management
- 12Traffic Management Plans to be provided to and agreed with Area Engineer prior to works where relevant.Traffic Access
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / 5861d54b-641f-44df-ae99-c88351771711.pdf / Document 128648Source PDF
- Chief Executives OrderSource: carlowcoco.eplanning.ie / 14cc4985-7291-4e7d-8f50-4001571d658f.pdf / Document 128647Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / 12b28b9e-be34-4a0a-b842-eb8828998fa7.pdf / Document 128972Source PDF
- F I Request LetterSource: carlowcoco.eplanning.ie / 3fa184d1-885d-4f06-874c-b5d4cfaa61c5.pdf / Document 110606Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 18255For replacement dwelling at Dunleckney, Muine Bheag, Co. Carlow, R21 PX53 to include the following: 1) To partially demolish/modify the existing single storey dwelling - to facilitate sightlines (by allowing for reinstatement of roadside wall alignment) & to convert the existing single storey dwelling to domestic garage 2) improvements to existing established vehicular site entrance 3) to construct a new two storey dwelling house 4) provision of a new treatment plant & percolation area 5) new bore hole well 6) all associated site development works. / 0.3 km away / 27 February 2019Conditional grant
- 21119Permission for the construction of a slatted shed and associated site works / 0.4 km away / 02 June 2021Conditional grant
- 21321For a stand-alone studio outbuilding within the grounds of Dunleckney Glebe House ancillary and associated with the residential use of the main building. Dunleckney Glebe House is a protected structure RPS reference CW276 / 0.4 km away / 02 February 2022Conditional grant
- 18195The development will consist of the improvement and upgrading of the existing public landing Jetty by replacing the damaged and deteriorating walkway with a slip resistant decking material and repairing the canal bank along the length of the Jetty to prevent future erosion and undercutting of the bank. A Natura Impact statement has been prepared for the project and submitted with the application. / 0.4 km away / 11 July 2018Conditional grant
- 2460419For the re-construction of a section of an existing riverside retaining wall to the Barrow Canal adjacent to junction of R705 and L3044, in the townland of Dunleckny, Bagnelstown. The development will consist of the re-construction of a section of an existing riverside retaining wall, approximately 12m long, which has partially collapsed. The new section of retaining wall shall be constructed in reinforced concrete with stone cladding to match the existing stone retaining wall. An Ecological Impact Assessment and a Natura Impact Statement have also been prepared in respect of the proposed works and submitted with the application. / 0.5 km away / 19 February 2025Conditional grant
- 2460312To construct a dormer style dwelling house, new site entrance, connect to public sewer and water mains, all ancillary site works and services / 0.6 km away / 26 May 2025Conditional grant
- 22186The construction of a portal frame Grain storage unit and all associated site development works / 0.6 km away / 29 July 2022Conditional grant
- 20145The construction of a portal frame light industrial storage unit and all associated site development works / 0.7 km away / 06 October 2020Conditional grant