Conditional grantDecided 13 February 2025Carlow County Council

2460026: Development will consist of essential maintenance and repair works to the Barrow Navigation, in accordance with Waterways Ireland’s statutory remit, comprising the following: (i) Bank Revetment & Strengthening Works, (ii) Post-Flood Spot Dredging & Maintenance Dredging, (iii) Back-drain Maintenance, (iv) Small-scale Bank Repair Works, (v) Trackway Surface Upgrade Works, (vi) 10 no. Temporary Construction Compounds, (vii) Temporary mobile welfare units, and, (viii) All works ancillary and incidental to the maintenance and repair works referred to above. A Natura Impact Statement (NIS) has been prepared in respect of the planning application and will be submitted with the planning application

Along the Barrow Navigation in the townlands of: Newacre Clogrenan Killeeshal Ballinabrannagh Harristown Bestfield or Dunganstown Strawhall Ballygowan, Rathellin LeighlinbridgeMoneybeg Sliguff Ballyellin and Tomdarragh Ballyteigelea (Idrone East By)
DecisionConditional grant
Decided13 February 2025
Application typePERMISSION
Source documents5

Site

What is on file

0refusal reasons17conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1No hydrocarbons from machinery to be disposed to groundwater or surface waters.Wastewater Drainage
  • 2No wastewater from temporary mobile welfare units to be disposed to groundwater or surface waters.Wastewater Drainage
  • 3No polluted water from temporary construction compounds to be disposed to groundwater or surface waters.Wastewater Drainage
  • 4No polluted water from temporary construction compounds to be disposed to the public road network.Wastewater Drainage
  • 5No interference with public road/footpath without consulting and agreeing with the Municipal Engineer.Traffic Access
  • 6No interference with roads-related drainage without initial consultation and approval by the Municipal Engineer.Traffic Access
  • 7No materials to be stored or deposited on the public road during works without prior consent of the Municipal Engineer.Traffic Access
  • 8Public roads to be maintained free of muck and debris during construction works at all times.Traffic Access
  • 9Any opening in adjacent public road/footpath requires a Road Opening License application per Guidelines for Managing Openings in Public Roads 2017.Traffic Access
  • 10Machinery and lorries to be kept free of muck/debris; road sweepers to be used where debris is deposited on public roadways.Traffic Access
  • 11CEMP to be submitted to Area Engineer prior to commencement of works.Construction Management
  • 12Traffic Management Plans to be provided to and agreed with Area Engineer prior to works where relevant.Traffic Access