Conditional grantDecided 17 July 2020Carlow County Council

20142: For the provision of new plant and equipment to include (i) new water cooling system to consist of cooling units, water storage bund (120m3 capacity), new covered pump bay (34m2) and new services gantry linking to existing distillery (ii) new centrifugation unit, to consist of centrifugal decanter, storage tank and pumps, screw conveyor and associated access gantry / walkway (25m2) with ladders / stairs, linked to existing distillery at first floor level (iii) new spirit chilling units (iv) alterations to existing distillery to consist of new first floor door linked to decanter gantry / walkway and (v) all associated site development works. (Protected Structure Ref CW 46). The proposed development has been subject to Appropriate Assessment and a Report for AA Screening has been prepared

Clorusk Lower, Royal Oak, Bagenalstown
DecisionConditional grant
Decided17 July 2020
Application typePERMISSION
Source documents3

Site

What is on file

0refusal reasons13conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • ,1Development to be carried out in accordance with plans received 07/05/20.Compliance
  • ,2Permission limited to plans submitted with application.Compliance
  • ,3External finishes to match existing colour.Design Materials
  • ,4Sightlines per DMRB; car parking per County Development Plan.Traffic Access
  • ,5Do not impair existing drainage; surface water to soakways/system per BS 8301:1985 and BRE Digest 365.Wastewater Drainage
  • ,6Surface water disposed on site; foul sewage to public sewer; no discharges to watercourses.Wastewater Drainage
  • ,7Comply with Irish Water connection agreements, CDS Technical Documentation, and separation distances.Water Services
  • ,8Construction noise/vibration per BS 5228; operational plant noise max 35 dB LAEQ, 15min; dust < 350mm/m2/day per VDI 2119.Construction Management
  • ,9No groundwater pollution; best practicable means for noise/dust; off-carriageway parking; site kept neat; no debris on public roads.Construction Management
  • ,10Warning signage for construction traffic during construction period.Construction Management
  • ,11Construction hours: Mon-Fri 08.00-18.00, Sat 08.00-13.00. No Sundays/Bank Holidays.Construction Management
  • ,12Comply with Building/Fire Regulations; consult Chief Fire Officer prior to commencement.Compliance

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.