Conditional grantDecided 19 November 2020Carlow County Council

20340: For the demolition of an existing dwelling, change of use, alterations & extension of an existing barn into a new single storey dwelling and all associated site works including upgrade of existing waste water treatment system to EPA code of practise 2009

Ballymogue, Ballon, Co. Carlow
DecisionConditional grant
Decided19 November 2020
Application typePERMISSION
Source documents3

Site

What is on file

0refusal reasons16conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • , Development must be carried out in accordance with plans received 01/10/20.Compliance
  • , Cabin structure on site must be removed within 4 weeks of grant.Compliance
  • , Permission covers only the submitted application; excludes other site development.Compliance
  • , External finishes per Drawing P-05: neutral render, blue/black or slate grey roof. No white uPVC for windows, doors, or rainwater goods.Design Materials
  • , Sightlines at road entrances per DMRB. Road opening licence required for road works.Traffic Access
  • , Retain/maintain boundary planting per Landscape Plan. New planting must be indigenous, completed in first planting season, replaced if failed.Landscaping Boundary
  • , Do not impair roadside drainage. Surface water to soakways/system on site per BS 8301:1985 and BRE Digest 365. No discharge to road or adjoining properties.Wastewater Drainage
  • , On-site wastewater system per EPA Code of Practice 2009. Certificate of compliance prior to occupation. Max 5 distribution pipes. Pipe seals, levelling devices, carbon vent filters, effluent filters. No surface water infiltration. Grease trap required.Wastewater Drainage
  • , Only clean surface water to soakpits/surface water system. Only foul/soiled water to wastewater system.Wastewater Drainage
  • , If connecting to public network, sign Irish Water agreement prior to commencement and comply with CDS Technical Documentation.Water Services
  • , Off-carriageway parking for construction traffic. No road parking. Keep road clean. Control noise/dust. Maintain litter-free site.Construction Management
  • , Submit Construction and Environmental Management Plan prior to commencement. Waste disposed at licensed facilities by licensed operators.Construction Management