21154: Permission for the construction of a new entrance to a site with an existing dwelling and all associated site works
Aclare, Myshall, Co. Carlow
DecisionConditional grant
Decided21 June 2021
Application typePERMISSION
Source documents3
Site
What is on file
0refusal reasons10conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- , Development must be carried out in accordance with plans received on 30/04/21.Compliance
- , Permission only covers the specific development detailed in the application; no other development is authorised.Compliance
- , Lines of sight at the new entrance must comply with DRMBS; verge kept clear; road opening licence required prior to commencement.Traffic Access
- , Existing vehicular entrance must be replaced with a pedestrian access only entrance per approved drawing.Traffic Access
- , Existing tree and hedgerow planting on and along site boundaries must be retained and maintained.Environment Ecology
- , Surface water must be collected and disposed of to soakways or a surface water system on site per BS 8301:1985 and BRE Digest 365; no discharge to public road or adjoining properties.Wastewater Drainage
- , Only clean surface water to soakpits/system; foul waste and soiled water to on-site wastewater treatment system.Wastewater Drainage
- , Connection to Irish Water network requires prior agreement; must comply with CDS Technical Documentation; subject to Irish Water Capital Investment Programme constraints.Water Services
- , Construction phase requires off-carriageway parking, prevention of debris on public roads, neat site maintenance, no materials on public road/footpath, and control of noise/dust emissions.Construction Management
- , Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00; no work on Sundays or Bank Holidays without prior written approval.Construction Management
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / D6897a2c-40a6-46d9-9717-5f4be74f28f5.pdf / Document 114675Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / 9d9d8f41-5ef1-43a4-b6bc-4172f40887e0.pdf / Document 114676Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 17177The construction of a new single story extension to the rear and sideof existing bungalow, new site entrance, septic tank with soil percolation system and bored well, along with all associated site works. Area of existing bungalow: 47m2. Area of proposed extension: 143m2. / 0.0 km away / 17 October 2017Conditional grant
- 2460004New dwelling, new on site waste water treatment system, new site entrance, new bored well and all associated site works / 0.5 km away / 22 March 2024Conditional grant
- 19145For the construction of a single storey house with new entrance, new septic tank with percolarion area and all associated site works / 0.5 km away / 30 July 2019Conditional grant
- 20115The proposed construction of a 4-bay slatted unit and suspended feed passage, to a proposed height of 6.450m, over side by side effluent tanks, as well as the construction of a retaining wall, and construction of an effluent tank in an Existing concrete floor shed, along with all associated ground works. / 0.6 km away / 09 July 2020Conditional grant
- 2167Construction of a two storey dwelling, detached garage, wastewater treatment system, bored well, new splayed entrance and all associated site development works / 0.8 km away / 21 June 2021Conditional grant
- 2560013To construct an extension to existing dwelling house, to renovate & make alterations to existing dwelling house, to upgrade existing sewage treatment system to epa guidelines, to demolish existing sheds with all associated site works / 0.9 km away / 15 August 2025Conditional grant
- 2360023Retention permission is sought for revisions made to the front elevation of dwelling permitted under PL ref No. 7406, Retention Permission is also sought for the as-built dormer type extension to same / 0.9 km away / 09 June 2023Conditional grant
- 2460301New split level dwelling, new site entrance, on site treatment system, bored well & all associated site works / 1.0 km away / 13 December 2024Conditional grant