22320: The construction of a portal frame storage unit with the installation of solar photovoltaic panels mounted to roof of same, with all associated ancillary site development works
Muinebheag Business Park, Royal Oak Road, Bagenalstown
DecisionConditional grant
Decided18 November 2022
Application typePERMISSION
Source documents3
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / F11c8734-ca40-4ad7-bd2a-b5853276fe4c.pdf / Document 107143Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / 5c530d9c-1c58-42b1-843c-01cc00c112ef.pdf / Document 107144Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 21300The provision of internal first floor office space including the addition of first floor windows to the north and west elevations and all associated ancillary works / 0.0 km away / 22 September 2021Conditional grant
- 19177For 1.8m wide pedestrian access from public footpath and all associated ancillary works / 0.1 km away / 25 June 2019Conditional grant
- 1729Permission is sought for revisions to previous grant of planning permission Ref 15/308 for the construction of an extension to the rear of existing commercial unit with all associated site development works / 0.1 km away / 31 March 2017Conditional grant
- 17320An extension to existing building consisting of extending existing locker room and new goods inwards/storage area at ground floor level and extending existing office area at first floor level, together with all associated site works. / 0.2 km away / 17 January 2018Conditional grant
- 1777Permission for a manufacturing /storage building adjacent to our existing premises, with new a new entrance off the Royal Oak Industrial Estate Road, together with all associated site and landscaping works / 0.2 km away / 08 May 2017Conditional grant
- 2560060The development will consist of a new Wastewater Pumping Station, two new kiosks (kiosk one 3.6m x 0.8m and kiosk two 2m x 1.8m, each 1.8m high), a new 50m3 below-ground storage tank, ground mounted solar PV array (30m2 total), new palisade perimeter fencing and gate (each 2.4m high), all on a site of 0.04 ha; the widening of the existing access road and the existing access to the R724, associated demolition of existing boundary wall and gate; a new 100mm diameter rising main (360m) and 225mm gravity sewer (190m) on the R724 between the proposed pumping station and Royal Oak Road; and all ancillary works. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application / 0.2 km away / 12 May 2025Conditional grant
- 20250(a) the change of use for part of existing portal frame building, from recreation centre to light industrial packaging / manufacturing area and visitor area. (b) External and internal alterations to include demolition of existing internal walls and alterations to roof structure and finishes. (c) The construction of an E.S.B. substation to include switch room and all ancillary development works / 0.2 km away / 11 November 2020Conditional grant
- 22402For (a) the erection of 3 no. water tanks having maximum height of 12 meters above ground level. (b) the relocation of 2 no. existing grain silos and all associated site works / 0.2 km away / 13 July 2023Conditional grant